SWE-072 - Last used in rev NPR 7150.2B
| Rev | SWE Statement |
|---|---|
| A | 3.4.8 The project shall provide and maintain bidirectional traceability from the Software Test Procedures to the software requirements. |
| Difference between A and B | No change |
| B | 4.5.9 The project manager shall provide and maintain bidirectional traceability from the software test procedures to the software requirements. |
| Difference between B and C | Last used in Rev B; Requirement merged into SWE-052 |
| C | DELETED |


