SWE-070 - Last used in rev NPR 7150.2D
| Rev | SWE Statement |
|---|---|
| A | 3.4.6 The project shall verify, validate, and accredit software models, simulations, and analysis tools required to perform qualification of flight software or flight equipment. |
| Difference between A and B | Changed project's responsibility to verify, validate, and accredit to just use ones that have been validated and accredited. |
| B | 4.5.7 The project manager shall use validated and accredited software models, simulations, and analysis tools required to perform qualification of flight software or flight equipment. |
| Difference between B and C | No change |
| C | 4.5.6 The project manager shall use validated and accredited software models, simulations, and analysis tools required to perform qualification of flight software or flight equipment. |
| Difference between C and D | No change |
| D | 4.5.6 The project manager shall use validated and accredited software models, simulations, and analysis tools required to perform qualification of flight software or flight equipment. |


