SWE-064 - Last used in rev NPR 7150.2B
| Rev | SWE Statement |
|---|---|
| A | 3.3.6 The project shall provide and maintain bidirectional traceability from software design to the software code. |
| Difference between A and B | Changed "provide" to "perform, record"; |
| B | 4.4.7 The project manager shall perform, record, and maintain bidirectional traceability from software design to the software code. |
| Difference between B and C | Last used in Rev B; Requirement merged into SWE-052 |
| C | DELETED |


