SWE-003 - Last used in rev NPR 7150.2D
| Rev | SWE Statement |
|---|---|
| A | 1.2.2 Each Center shall maintain, staff, and implement a plan to continually advance its in-house software engineering capability and monitor the software engineering capability of NASA's contractors, as per NASA's Software Engineering Initiative Improvement Plan. |
| Difference between A and B | Reworded and removed reference to NASA SEIIP. |
| B | 2.1.3.2 Center Directors, or designees, shall maintain, staff, and implement a plan to continually advance the Center’s in-house software engineering capability and monitor the software engineering capability of NASA's contractors. |
| Difference between B and C | No change |
| C | 2.1.5.2 Center Director, or designee, shall maintain, staff, and implement a plan to continually advance the Center’s in-house software engineering capability and monitor the software engineering capability of NASA's contractors. |
| Difference between C and D | No change |
| D | 2.1.5.2 Center Director, or designee, shall maintain, staff, and implement a plan to continually advance the Center’s in-house software engineering capability and monitor the software engineering capability of NASA's contractors. |


