This is the table from Topic 8.18, reformatted a little but without TABSETUP and other things that might break sticky headers. It doesn't have sticky headers and I don't know why.
| Metrics Type | Measurements | PLAN | REQ | DES | IMP | TEST | DEL | Associated SWE Reqt # |
|---|---|---|---|---|---|---|---|---|
Peer Review Metrics | # of peer reviews performed vs. # of peer reviews planned | X | X | X | X | X | SWE-016 SWE-087 SWE-089 | |
Peer Review Metrics | # of Non-Conformances identified in each peer review | X | X | X | X | X | SWE-087 SWE-089 | |
Peer Review Metrics | # of Non-Conformances identified by software assurance during each peer review | X | X | X | X | X | SWE-087 SWE-088 SWE-089 | |
Peer Review Metrics | Total # of peer review Non-Conformances (Open, Closed) | X | X | X | X | X | SWE-087 SWE-088 SWE-089 | |
Peer Review Metrics | Preparation time each review participant spent preparing for the review | X | X | X | X | X | SWE-088 SWE-089 | |
Peer Review Metrics | Time required to close review Non-Conformances | X | X | X | X | X | SWE-087 SWE-088 SWE-089 | |
Peer Review Metrics | # of peer review participants vs. total # invited | X | X | X | X | X | SWE-088 SWE-089 | |
Peer Review Metrics | # of peer review Non-Conformances per work product vs. # of peer reviewers | X | X | X | X | X | SWE-088 SWE-089 | |
Peer Review Audit Metrics | # of audit Non-Conformances per peer review audit | X | X | X | X | X | SWE-088 | |
Peer Review Audit Metrics | # of Peer Review Audits planned vs. # of Peer Review Audits performed | X | X | X | X | X | SWE-016 SWE-087 SWE-088 | |
Peer Review Audit Metrics | Trends on non-conformances from audits (Open, Closed, Life cycle Phase) | X | X | X | X | X | SWE-088 SWE-089 | |
Peer Review Audit Metrics | Time required to close peer review audit Non-Conformances | X | X | X | X | X | SWE-088 SWE-089 | |
Peer Review Audit Metrics | Preparation time each audit participant spent preparing for audit | X | X | X | X | X | SWE-088 SWE-089 | |
Problem/Change Report Status Metrics | Total # of Non-Conformances over time (Open, Closed, # of days Open, and Severity of Open) # of Non-Conformances in current reporting period (Open, Closed, Severity) | X | X | X | X | X | X | SWE-062 SWE-065c SWE-065d SWE-068 SWE-202 SWE-203 SWE-204 |
Problem/Change Report Status Metrics | # of safety-related Non-Conformances | X | X | X | X | X | SWE-203 SWE-068 SWE-071 | |
Problem/Change Report Status Metrics | Trend of Open vs. Closed Non-Conformances over time | X | X | X | X | X | X | SWE-053 SWE-054 SWE-065 |
Problem/Change Report Status Metrics | Trend of change status over time (# of changes approved, # in implementation, # in test, # closed) | X | X | X | X | X | X | SWE-018 SWE-053 SWE-080 |
Problem/Change Report Status Metrics | # of Non-Conformances identified in embedded COTS, GOT, MOTS, OSS, or reused components in ground or flight software vs. # of Non-Conformances closed | X | X | X | SWE-136 SWE-202 SWE-203 SWE-211 | |||
Problem/Change Report Status Metrics | # of Non-Conformances identified in source code products used (Open, Closed) | X | X | X | SWE-202 SWE-203 | |||
Problem/Change Report Status Metrics | # of software Non-Conformances at each Severity level for each software configuration item (Open, Closed) Bold type indicates a required item |
|
|
| X | X | X | SWE-202 |
Problem/Change Report Status Metrics | # of Closed action items vs. # of Open action items | X | X | X | X | X | X | SWE-062 SWE-62c SWE-065d |
Problem/Change Report Status Metrics | # of Root Cause Analyses performed; # of Non-Conformances identified by each root cause analysis | X | X | X | X | SWE-204 | ||
SA Corrective Action (CA) metrics (Issues, Risks) | # of Corrective Actions (CAs) raised by SA vs. total # Attributes (Type, Severity, # of days Open, Life cycle Phase Found) State (Open, In work, Closed) Trends of CA Open vs. Closures over time | X | X | X | X | X | X | SWE-024 SWE-204 SWE-054 |
SA Corrective Action (CA) metrics (Issues, Risks) | Trend the # of inconsistencies or corrective actions identified, and # closed. | X | X | X | X | X | SWE-054 SWE-024 SWE-204 | |
| SA Corrective Action (CA) metrics (Issues, Risks) | # of open vs. closed issues over time and latency | X | X | X | X | X | X | SWE-018 |
Process Improvement Metrics | # of software work product Non-Conformances identified by life cycle phase over time | X | X | X | X | X | X | SWE-013 SWE-022 SWE-024 SWE-039 SWE-051 SWE-054 SWE-057 SWE-058 SWE-062 SWE-065b SWE-065c SWE-065d SWE-068 SWE-071 SWE-075 SWE-079 SWE-084 SWE-086 SWE-087 SWE-125 SWE-134 SWE-139 SWE-146 SWE-157 SWE-159 SWE-184 SWE-185 SWE-187 SWE-191 SWE-194 SWE-201 SWE-204 SWE-205 |
Process Improvement Metrics | # of software process Non-Conformances by life cycle phase over time | X | X | X | X | X | X | SWE-032 SWE-039 SWE-061 SWE-077 SWE-080 SWE-082 SWE-085 SWE-086 SWE-088 SWE-139 SWE-195 SWE-204 |
Process Improvement Metrics | Identify the specific requirements in NASA-STD-8739.8 that are being tailored by the projects (*organizational metric) | X | X | X | X | X | X | SWE-121 SWE-125 SWE-013 SWE-176 |
Process Improvement Metrics | # of projects tailoring each requirement (*organizational measure) % of requirements tailored per project (*organizational measure) | X | X | X | X | SWE-125 SWE-013 SWE-121 | ||
Process Improvement Metrics | % of Total Source Code for each Software Classification (*organizational measure) | X | X | X | SWE-020 SWE-176 SWE-087 | |||
Cost/ Effort Metrics | Planned SA resource allocation vs. actual SA resource allocation | X | X | X | X | X | X | SWE-015 SWE-174 SWE-151 |
Cost/ Effort Metrics | Comparison of initial SA cost estimates vs. final cost (capturing assumptions and differences) | X | X | SWE-174 SWE-015 SWE-151 | ||||
Cost/ Effort Metrics | Trend SA cost estimates throughout life cycle | X | X | X | X | X | X | SWE-174 |
Training Metrics | % of required training completed for each of the project SA personnel | X | X | X | X | SWE-017 | ||
Training Metrics | % of project personnel that have completed project specific training against the planned training schedule | X | X | X | X | X | SWE-017 | |
Compliance Audit Metrics | # of Compliance Audits planned vs. # of Compliance Audits performed | X | X | X | X | X | X | SWE-024 SWE-039 SWE-139 SWE-016 SWE-032 SWE-077 SWE-195 SWE-082 SWE-084 SWE-085 SWE-086 SWE-088 SWE-079 SWE-201 |
Compliance Audit Metrics | # of Open vs. Closed Audit Non-Conformances over time # of Non-Conformances per audit (including findings from process and compliance audits, process maturity) | X | X | X | X | X | X | SWE-022 SWE-024 SWE-039 SWE-139 SWE-016 SWE-032 SWE-077 SWE-079 SWE-195 SWE-082 SWE-084 SWE-085 SWE-086 SWE-088 SWE-201 |
Compliance Audit Metrics | # of Non-Conformances identified in plans (e.g., SMPs, SDPs, CM Plans, SA Plans, Safety Plans, Test Plans) | X | X | X | X | X | SWE-024 SWE-013 SWE-075 SWE-079 SWE-139 SWE-071 | |
Compliance Audit Metrics | # of Non-Conformances identified in the software Configuration Management Plan Trends of # Open vs. # Closed over time | X | X | X | X | X | SWE-079 | |
Compliance Audit Metrics | # of Configuration Management Audits conducted by the project – Planned vs. Actual | X | X | X | X | X | SWE-082 SWE-077 SWE-084 | |
Compliance Audit Metrics | # of Non-Conformances per audit (including findings from process and compliance audits, process maturity) | X | X | X | X | X | X | SWE-024 SWE-039 SWE-139 SWE-016 SWE-032 SWE-077 SWE-195 SWE-082 SWE-084 SWE-085 SWE-086 SWE-088 SWE-079 |
Compliance Audit Metrics | # of process Non-Conformances (e.g., activities not performed) identified by SA vs. # accepted by the project Trends of # Open vs. # Closed over time | X | X | X | X | X | X | SWE-016 SWE-039 SWE-032 SWE-077 SWE-195 SWE-082 SWE-084 SWE-085 SWE-086 SWE-088 |
Compliance Audit Metrics | # of Non-Conformances found in flight code, ground code, tools, and COTs products used (Open vs. Closed). | X | X | X | X | SWE-136 | ||
Compliance Audit Metrics | # of open non-compliances vs. # of closed non-compliances found in security scans or coding standard compliance audits. | X | X | X | X | SWE-63 | ||
Project Acceptance Metrics | # of Non-Conformances (activities not being performed) # of Non-Conformances accepted by project # of Non-Conformances (Open, Closed, Total) Trends of Open vs, Closed Non-Conformances over time | X | X | X | X | X | X | SWE-087 SWE-201 SWE-039 SWE-139 |
Progress Tracking Metrics | Deviations of actual schedule progress vs. planned schedule progress above defined threshold | X | X | X | X | X | X | SWE-016 SWE-018 SWE-046 |
Progress Tracking Metrics | # of Software Requirements (e.g. Project, Application, Subsystem, System, etc.) | X | X | X | X | X | SWE-050 SWE-051 SWE-052 SWE-065b SWE-066 SWE-194 SWE-027 | |
Progress Tracking Metrics | # of Software Requirements that do not trace to a parent requirement | X | X | X | SWE-033 SWE-050 SWE-051 | |||
Progress Tracking Metrics | # of architectural issues identified vs. number closed | X | SWE-057 SWE-058 SWE-143 | |||||
| Progress Tracking Metrics | # of planned units for implementation vs. # of units tested and implemented | X | SWE-060 | |||||
Progress Tracking Metrics | # of planned unit test cases vs. # of actual unit test cases completed | X | SWE-062 SWE-186 | |||||
Progress Tracking Metrics | Total # of tests completed vs. # of test results evaluated and signed off | X | X | SWE-066 SWE-068 SWE-065d SWE-159 | ||||
Progress Tracking Metrics | # of Safety-Critical tests executed vs. # of Safety-Critical tests witnessed by SA | X | X | X | SWE-066 SWE-068 SWE-065d SWE-159 SWE-062 SWE-186 | |||
Progress Tracking Metrics | # of software components (e.g. programs, modules, routines, functions, etc.) planned vs. # actually released in each build | X | X | SWE-194 SWE-077 SWE-073 SWE-036 | ||||
Progress Tracking Metrics | # of Non-Conformances from reviews (Open vs. Closed; # of days Open) | X | X | X | X | X | X | SWE-134 SWE-037 SWE-039 SWE-087 SWE-088 SWE-089 SWE-143 |
Progress Tracking Metrics | # of Software Requirements being met via satisfactory testing vs. total # of Software Requirements | X | X | X | SWE-065d SWE-066 SWE-192 SWE-071 | |||
Progress Tracking Metrics | # of Software Requirements without associated test cases | X | X | X | SWE-066 SWE-065b SWE-071 | |||
Progress Tracking Metrics | # of design issues found vs. # of design issues resolved | X | X | SWE-058 | ||||
Progress Tracking Metrics | # of planned units for implementation vs. # of units implemented and unit tested. | X | X | X | SWE-060 | |||
Risk Management Metrics | # of Risks identified in each life cycle phase (Open, Closed) | X | X | X | X | X | X | SWE-086 SWE-039 SWE-179 SWE-154 SWE-156 SWE-190 |
Risk Management Metrics | # of Risks by Severity (e.g., red, yellow, green) over time | X | X | X | X | X | X | SWE-032 SWE-033 SWE-039 SWE-086 SWE-154 SWE-156 SWE-179 SWE-190 SWE-191 |
Risk Management Metrics | # of Risks with mitigation plans vs. total # of Risks | X | X | X | X | X | X | SWE-032 SWE-033 SWE-039 SWE-086 SWE-154 SWE-156 SWE-179 SWE-190 SWE-191 |
Risk Management Metrics | # of Risks trending up over time # of Risks trending down over time | X | X | X | X | X | X | SWE-032 SWE-033 SWE-039 SWE-086 SWE-154 SWE-156 SWE-179 SWE-190 SWE-191 |
Cybersecurity Risk Metrics | # of Cybersecurity Risks identified (Open, Closed, Severity) | X | X | X | X | SWE-154 SWE-156 | ||
Cybersecurity Risk Metrics | ·of Cybersecurity Risks with Mitigations vs. # of Cybersecurity Risks identified | X | X | X | X | SWE-154 SWE-156 SWE-159 | ||
Traceability Metrics | % of traceability completed in each area: System Level requirements to Software requirements; Software Requirements to Design; Design to Code; Software Requirements to Test Procedures | X | X | X | X | SWE-052 | ||
Traceability Metrics | % of traceability completed for all hazards to software requirements and test procedures | X | X | X | X | SWE-052 | ||
Traceability Metrics | Defect trends for trace quality (# of circular traces, orphans, widows, etc.) | X | SWE-051 SWE-052 | |||||
Requirements Metrics | # of detailed software requirements vs. # of estimated SLOC to be developed by the project | X | X | X | SWE-050 SWE-051 SWE-151 SWE-174 | |||
Requirements Metrics | # of incorrect, missing and incomplete requirements (i.e., # of requirements issues) vs. # of requirements issues resolved | X | X | SWE-051 SWE-053 SWE-054 | ||||
Requirements Metrics | Software Requirements Volatility (# of requirements added, deleted, modified, # of TBDs over time) |
| X | X | X | X |
| SWE-200 SWE-053 |
Requirements Metrics | # of TBD/TBC/TBR requirements trended over time |
|
| X | X | X | X | SWE-066 |
Safety Metrics | # of safety-related requirement issues (Open, Closed) over time | X | X | X | X | X | SWE-039 SWE-139 SWE-205 SWE-023 SWE-134 SWE-184 SWE-052 SWE-051 SWE-058 SWE-065b SWE-066 SWE-071 SWE-192 SWE-080 SWE-087 | |
Safety Metrics | # of safety-related non-conformances identified by life cycle phase (over time, Open vs. Closed, # of days) | X | X | X | X | X | SWE-013 SWE-039 SWE-139 SWE-143 SWE-121 SWE-184 SWE-023 SWE-134 SWE-052 SWE-051 SWE-057 SWE-058 SWE-135 SWE-062 SWE-065a SWE-065b SWE-065c SWE-065d SWE-066 SWE-068 SWE-071 SWE-191 SWE-080 SWE-081 SWE-087 SWE-205 | |
Reuse Metrics | # of products submitted for reuse; # of developed products submitted for reuse vs. total # of developed products | X | SWE-147 SWE-148 | |||||
Reuse Metrics | # of developed products entered in NASA Internal Sharing & Reuse System vs. total # of developed products | X | SWE-147 SWE-148 | |||||
Reuse Metrics | # of products submitted for reuse vs. # of products entered into NASA Internal Sharing & Reuse Systems | X | SWE-147 SWE-148 | |||||
Cybersecurity Metrics | # of Cybersecurity vulnerabilities and weaknesses identified # of Cybersecurity vulnerabilities and weaknesses (Open, Closed, Severity) Trending of Open vs. Closed over time | X | X | X | X | X | X | SWE-159 SWE-135 SWE-063 |
Cybersecurity Metrics | # and type of vulnerabilities and weaknesses identified by the project | X | X | X | X | X | SWE-135 SWE-063 | |
Cybersecurity Metrics | # of Cybersecurity vulnerabilities and weaknesses identified by life cycle phase | X | X | X | X | X | SWE-159 SWE-135 SWE-063 | |
Cybersecurity Metrics | # of Cybersecurity vulnerabilities and weaknesses identified vs. # resolved during Implementation | X | X | X | SWE-159 SWE-135 SWE-063 | |||
Cybersecurity Metrics | # of requirements specified relating to detection of adversarial actions vs. # of requirements related to detection of adversarial actions actually implemented | X | X | X | SWE-210 | |||
Cybersecurity Metrics | # of Non-Conformances identified in Cybersecurity coding standard compliance (Open, Closed) | X | X | X | SWE-063 SWE-135 SWE-207 | |||
Test Coverage Metrics | Software code/test coverage percentages for all identified safety-critical components (e.g., # of paths tested vs. total # of possible paths) Note: Metrics in bold type are required by all projects | X | SWE-066 | |||||
Test Coverage Metrics | Test coverage data for all identified safety-critical software components. | X | SWE-219 | |||||
Test Coverage Metrics | % of code that has been executed during testing | X | SWE-060 | |||||
Static Code Metrics | Document the Static Code Analysis tools used with associated Non-Conformances ·of total errors and warnings identified by the tool # of errors and warnings evaluated vs. # of total errors and warnings identified by the tool | X | SWE-135 SWE-185 | |||||
Static Code Metrics | # of Non-Conformances raised by SA vs. total # of raised Non-Conformances | X | SWE-135 SWE-185 | |||||
Static Code Metrics | # of static code errors and warnings identified as “positives” vs. # of total errors and warnings identified by the tool Total # of static code analysis "positives" vs. # of "positives" resolved. Trend over time. # of static code errors and warnings resolved by Severity vs. # of static code errors and warnings identified by Severity by the tool | X | SWE-135 SWE-185 | |||||
Static Code Metrics | # of static code “positives” over time (Open, Closed, Severity) | X | X | SWE-135 SWE-185 | ||||
Static Code Metrics | # of Cybersecurity vulnerabilities and weaknesses identified by the tool | X | X | SWE-135 SWE-185 | ||||
Static Code Metrics | # of coding standard violations identified (Open, Closed, type of violation, Severity) | X | SWE-061 SWE-185 | |||||
Static Code Metrics | Software cyclomatic complexity # for all identified safety-critical components | X | X | SWE-087 SWE-134 | ||||
Static Code Metrics | Trend of # of total errors and warnings identified per SCA Tool, Language, and SLOC size | X | SWE-135 | |||||
Static Code Metrics | Total # of static code analysis "positives" vs. # of "positives" resolved. Trend over time. | X | SWE-135 | |||||
Test Procedures Metrics | # of Non-Conformances and risks open vs. # of Non-Conformances, risks, identified with test procedures | X | X | SWE-087 SWE-065b SWE-071 SWE-191 | ||||
Test Procedures Metrics | # of hazards with completed test procedures/cases vs. total number of hazards over time | X | X | SWE-065b SWE-068 SWE-191 | ||||
Test Procedures Metrics | # of software requirements with completed test procedures/cases over time | X | X | SWE-065b SWE-071 SWE-066 | ||||
Test Procedures Metrics | # of Non-Conformances identified when the approved, updated requirements are not reflected in test procedures | X | X | SWE-065b SWE-071 SWE-052 SWE-066 SWE-191 | ||||
Test Procedures Metrics | # of Non-Conformances identified while confirming hazard controls are verified through test plans/procedures/cases | X | X | SWE-065b SWE-071 SWE-066 SWE-068 SWE-191 | ||||
Test Procedures Metrics | # of issues and risks/corrective actions open vs. total # of issues and risks/corrective actions identified with test procedures | X | X | X | SWE-065b | |||
Test Metrics | # of tests executed vs. # of tests completed | X | X | X | SWE-062 SWE-066 SWE-065d SWE-068 SWE-159 SWE-190 SWE-192 SWE-055 SWE-080 SWE-191 SWE-194 SWE-211 | |||
Test Metrics | # of Non-Conformances identified during each testing phase (Open, Closed, Severity) | X | X | X | SWE-062 SWE-065d SWE-066 SWE-068 SWE-080 SWE-159 SWE-190 SWE-191 SWE-192 SWE-194 SWE-211 | |||
Test Metrics | ·of Requirements tested vs. total # of Requirements | X | X | X | SWE-062 SWE-065b SWE-065d SWE-066 SWE-080 SWE-191 SWE-192 SWE-194 | |||
Test Metrics | # of Hazards containing software that have been tested vs. total # of Hazards containing software | X | X | X | SWE-062 SWE-066 SWE-068 SWE-080 SWE-134 SWE-192 SWE-205 | |||
Test Metrics | # of Non-Conformances identified in models, simulations, and tools over time (Open, Closed, Severity) | X | X | X | SWE-070 | |||
Test Metrics | # of Regression test set Non-Conformances/Risks over time (Open, Closed, Severity) | X | X | X | SWE-191 | |||
| Test Metrics | # of risks and Non-conformances open vs. total # of risks and Non-Conformances identified with test code | X | X | X | SWE-065c | |||
Test Metrics | # of Requirements tested in customer environment vs. # of Requirements | X | X | SWE-055 | ||||
Cybersecurity Metrics During Testing Metrics | # of Cybersecurity mitigation implementations identified from the security vulnerabilities and security weaknesses | X | X | X | SWE-154 SWE-159 SWE-191 | |||
Cybersecurity Metrics During Testing Metrics | # of Cybersecurity mitigation implementations identified with associated test procedures vs. # of Cybersecurity mitigation implementations identified | X | X | X | SWE-154 SWE-159 SWE-191 | |||
Cybersecurity Metrics During Testing Metrics | # of Cybersecurity mitigation tests completed vs. total # of Cybersecurity mitigation tests | X | X | X | SWE-159 | |||
Cybersecurity Metrics During Testing Metrics | # of Non-Conformances identified during Cybersecurity mitigation testing (Open, Closed, Severity) | X | X | X | SWE-159 | |||
Cybersecurity Metrics During Testing Metrics | Trends of Cybersecurity Non-Conformances over time | X | X | X | SWE-159 SWE-063 SWE-135 SWE-201 | |||
Test Coverage Metrics | Software code/test coverage percentages for all identified safety-critical components (e.g., # of paths tested vs. total # of possible paths) |
|
|
| X | X | X | SWE-066 SWE-190 SWE-134 SWE-189 |
Test Coverage Metrics | # of tests completed vs. total # of tests | X | X | X | SWE-055 SWE-062 SWE-066 SWE-065d SWE-068 SWE-080 SWE-159 SWE-190 SWE-191 SWE-192 SWE-194 SWE-211 | |||
Test Coverage Metrics | # of detailed software requirements tested to date vs. total # of detailed software requirements | X | X | X | SWE-055 SWE-062 SWE-065b SWE-065d SWE-066 SWE-071 SWE-080 SWE-191 SWE-192 SWE-194 SWE-159 | |||
Test Coverage Metrics | # of safety-critical requirement verifications vs. total # of safety-critical requirement verifications completed # of Open issues vs. # of Closed over time | X | X | X | SWE-062 SWE-066 SWE-191 SWE-192 SWE-068 | |||
Test Coverage Metrics | # of Source Lines of Code (SLOC) tested vs. total # of SLOC | X | X | X | SWE-066 SWE-134 SWE-189 SWE-190 SWE-219 | |||
Build/Release Content Metrics | # of software units planned vs. # actually built | X | X | X | X | SWE-063 SWE-194 | ||
Build/Release Content Metrics | # of planned software requirements implemented in each build vs. # of actual software requirements implemented in each build | X | X | X | SWE-063 SWE-194 | |||
Build/Release Content Metrics | # of Non-Conformances identified in release documentation (Open, Closed) | X | X | X | SWE-063 SWE-077 SWE-084 SWE-085 | |||
Operations/ Maintenance Metrics | # of Non-Conformances identified in the software after delivery | X | SWE-195 | |||||
Other Metrics | Measures relating to status and performance as identified in other requirements. (Schedule deviations, closure of corrective actions, product and process audit results, peer review result, etc) | X | X | X | X | SWE-093 | ||
Other Metrics | # of requirements being met, any TBD/TBC/TBR requirements, or any requirements that are not being met Performance and functionality measures (Schedule deviations, closure of corrective actions, product and process audit results, peer review results, requirements volatility, # of requirements satisfactorily tested vs. total # of requirements, etc.) | X | X | X | X | SWE-199 | ||
Other Metrics | # of findings open vs. # of findings identified | X | X | X | X | X | SWE-082 | |
Other Metrics | Trends of Open vs. Closed Non-Conformances change reports over time. | X | X | X | X | X | SWE-065d | |
IV&V Metrics (Kept by IV&V) | # of IV&V Non-Conformances/issues,/risks (Open, Closed, accepted by the project, severity, category of Non-Conformance (e.g., requirements severity, category (requirements, design, code, test, documentation, etc.)) Kept by IV&V team, not SA | X | X | X | X | X | X | SWE-179 |
Coverage Metrics | Code coverage data: % of code that has been executed during testing | X | X | X | SWE-060 | |||
Coverage Metrics | Test coverage data for all identified safety-critical software components. | X | X | X | SWE-219 |