Other SWE-058 Relevant Work Products

  1. What is to be performed and produced in each phase of the design process (see SDP-SMP) 
  2. List of design components including when they are expected to be available - as input to Development Schedule
  3. List of methods, tools, standards, and guidelines for your project (see SWE-061)
  4. Applicable and efficient design methods being implemented on your project
  5. Well-documented software development process (see SWE-036)
  6. Systems Requirements Specification (see SRS)
  7. Developers trained and experienced in the chosen development process and methods (see SWE-017)
  8. Software reuse being considered throughout the development effort (see SWE-027)
  9. Off-the-shelf software being considered for use on the project (see SWE-027)
  10. Analysis of alternatives 
  11. Selection of architecture and design methods based on system operational characteristics
  12. Characteristics of all data elements identified (type, format, size, units, and others important to the project) (see SDD)
  13. Configuration control process (see SCMP)
  14. CASE tools being used to assist and document the design effort (see SWE-136)
  15. Requirements traceable to design elements (see SWE-052)
  16. Design elements traceable to specific requirements