bannerd

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
SM ItemSWE Related linksSM Related LinksRelated Activity
7.01 - History and Overview of the Software Process Improvement (SPI) Effort

Include Page
7.01 - Related SWEs
7.01 - Related SWEs

Include Page
7.01 - Related SM
7.01 - Related SM

Include Page
7.01 - Related Activities
7.01 - Related Activities

7.02 - Classification and Safety-Criticality

Include Page
7.02 - Related SWEs
7.02 - Related SWEs

Include Page
7.02 - Related SM
7.02 - Related SM

Include Page
7.02 - Related Activities
7.02 - Related Activities

7.03 - Acquisition Guidance

Include Page
7.03 - Related SWEs
7.03 - Related SWEs

Include Page
7.03 - Related SM
7.03 - Related SM

Include Page
7.03 - Related Activities
7.03 - Related Activities

7.04 - Flow Down of NPR Requirements on Contracts and to Other Centers in Multi-Center Projects

Include Page
7.04 - Related SWEs
7.04 - Related SWEs

Include Page
7.04 - Related SM
7.04 - Related SM

Include Page
7.04 - Related Activities
7.04 - Related Activities

7.05 - Work Breakdown Structures That Include Software

Include Page
7.05 - Related SWEs
7.05 - Related SWEs

Include Page
7.05 - Related SM
7.05 - Related SM

Include Page
7.05 - Related Activities
7.05 - Related Activities

7.06 - Software Test Estimation and Testing Levels

Include Page
7.06 - Related SWEs
7.06 - Related SWEs

Include Page
7.06 - Related SM
7.06 - Related SM

Include Page
7.06 - Related Activities
7.06 - Related Activities

7.07 - Software Architecture Description

Include Page
7.07 - Related SWEs
7.07 - Related SWEs

Include Page
7.07 - Related SM
7.07 - Related SM

Include Page
7.07 - Related Activities
7.07 - Related Activities

7.08 - Maturity of Life Cycle Products at Milestone Reviews

Include Page
7.08 - Related SWEs
7.08 - Related SWEs

Include Page
7.08 - Related SM
7.08 - Related SM

Include Page
7.08 - Related Activities
7.08 - Related Activities

7.09 - Entrance and Exit Criteria

Include Page
7.09 - Related SWEs
7.09 - Related SWEs

Include Page
7.09 - Related SM
7.09 - Related SM

Include Page
7.09 - Related Activities
7.09 - Related Activities

7.10 - Peer Review and Inspections Including Checklists

Include Page
7.10 - Related SWEs
7.10 - Related SWEs

Include Page
7.10 - Related SM
7.10 - Related SM

Include Page
7.10 - Related Activities
7.10 - Related Activities

7.11 - SWE Historylink in all SWEs section 1.2

n/a


7.12 - Retired in SWEHBVDn/an/a
7.13 - Transitioning to a Higher Class

Include Page
7.13 - Related SWEs
7.13 - Related SWEs

Include Page
7.13 - Related SM
7.13 - Related SM

Include Page
7.13 - Related Activities
7.13 - Related Activities

7.14 - Implementing Measurement Requirements and Analysis for Projects

Include Page
7.14 - Related SWEs
7.14 - Related SWEs

Include Page
7.14 - Related SM
7.14 - Related SM

Include Page
7.14 - Related Activities
7.14 - Related Activities

7.15 - Relationship Between NPR 7150.2 and NASA-STD-7009

Include Page
7.15 - Related SWEs
7.15 - Related SWEs

Include Page
7.15 - Related SM
7.15 - Related SM

Include Page
7.15 - Related Activities
7.15 - Related Activities

7.16 - Appendix C. Requirements Mapping and Compliance Matrix

Include Page
7.16 - Related SWEs
7.16 - Related SWEs

Include Page
7.16 - Related SM
7.16 - Related SM

Include Page
7.16 - Related Activities
7.16 - Related Activities

7.17 - 7150.2D Appendices (Definitions, References, etc.)n/an/a
include

n/a 

7.
17 - Related Activities7.17 - Related Activities7.
18 - Documentation Guidance

Include Page
7.18 - Related SWEs
7.18 - Related SWEs

Include Page
7.18 - Related SM
7.18 - Related SM

Include Page
7.18 - Related Activities
7.18 - Related Activities

7.19 - Software Risk Management Checklists

Include Page
7.19 - Related SWEs
7.19 - Related SWEs

Include Page
7.19 - Related SM
7.19 - Related SM

Include Page
7.19 - Related Activities
7.19 - Related Activities

7.20 - Assessing - Meets the Intentn/an/a

Include Page
7.20 - Related Activities
7.20 - Related Activities

7.21 - Multi-condition Software Requirements

Include Page
7.21 - Related SWEs
7.21 - Related SWEs

Include Page
7.21 - Related SM
7.21 - Related SM

Include Page
7.21 - Related Activities
7.21 - Related Activities

8
7.
01 - Off Nominal Testing
22 - Space Security: Best Practices Guide

Include Page

8

7.

01

22 - Related SWEs

8

7.

01

22 - Related SWEs

Include Page

8

7.

01

22 - Related SM

8

7.

01

22 - Related SM

Include Page

8

7.

01

22 - Related Activities

8

7.

01

22 - Related Activities

8.
02 - Software Reliability
01 - Off Nominal Testing
  • Include Page
    8.

02
  • 01 - Related SWEs
    8.

02
  • 01 - Related SWEs

Include Page8.02 - Related SM8.02 - Related SM Include Page8.02 - Related Activities8.02 - Related Activities8.03 - Organizational Goals of Software Assurance Metrics Include Page8.03 Related SWEs8.03 Related SWEs Include Page8.03 Related SM8.03 Related SM Include Page8.03 - Related Activities8.03 - Related Activities8.04 - Additional Requirements Considerations for Use with Safety-Critical Software

Include Page
8.01 - Related Activities
8.01 - Related Activities

8.02 - Software Quality

Include Page
8.02 - Related SWEs
8.02

Include Page8.04 - Related SWEs8.04 - Related SWEs Include Page8.04 - Related SM8.04 - Related SM Include Page8.04 - Related Activities8.04 - Related Activities8.05 - SW Failure Modes and Effects Analysis Include Page8.05 - Related SWEs8.05 - Related SWEs Include Page8.05 - Related SM8.05 - Related SM Include Page8.05 - Related Activities8.05 - Related Activities8.6 - IV&V Surveillance Include Page8.06 - Related SWEs8.06 - Related SWEs Include Page8.06 - Related SM8.06 - Related SM Include Page8.06 - Related Activities8.06 - Related Activities8.07 - Software Fault Tree Analysis Include Page8.07 - Related SWEs8.07 - Related SWEs Include Page8.07 - Related SM8.07 - Related SM Include Page8.07 - Related Activities8.07 - Related Activities8.08 - COTS Software Safety Considerations Include Page8.08 - Related SWEs8.08 - Related SWEs Include Page8.08 - Related SM8.08 - Related SM Include Page8.08 - Related Activities8.08 - Related Activities8.9 - Software Safety Analysis Include Page8.09 - Related SWEs8.09 - Related SWEs Include Page8.09 - Related SM8.09 - Related SM Include Page8.09 - Related Activities8.09 - Related Activities8.10 - Facility Software Safety Considerations Include Page8.10 - Related SWEs8.10 - Related SWEs Include Page8.10 - Related SM8.10 - Related SM Include Page8.10 - Related Activities8.10 - Related Activities8.11 - Auto-Generated Code Include Page8.11 - Related SWEs8.11 - Related SWEs Include Page8.11 - Related SM8.11 - Related SM Include Page8.11 - Related Activities8.11 - Related Activities8.12 - Basics of Software Auditing Include Page8.12 - Related SWEs8.12

- Related SWEs

Include Page
8.

12

02 - Related SM
8.

12

02 - Related SM

Include Page
8.

12

02 - Related Activities
8.

12

02 - Related Activities

8.
13 - Test Witnessing
04 - Additional Requirements Considerations for Use with Safety-Critical Software

Include Page
8.

13

04 - Related SWEs
8.

13

04 - Related SWEs

Include Page
8.

13

04 - Related SM
8.

13

04 - Related SM

Include Page
8.

13

04 - Related Activities
8.

13

04 - Related Activities

8.
14 - SA Tasking for NPR 7150.2B
05 - SW Failure Modes and Effects Analysis

Include Page
8.

14

05 - Related SWEs
8.

14

05 - Related SWEs

Include Page
8.

14

05 - Related SM
8.

14

05 - Related SM

Include Page
8.

14

05 - Related Activities
8.

14

05 - Related Activities

8.
15 - SA Tasking Checklist Tool
6 - IV&V Surveillance

Include Page
8.

15

06 - Related SWEs
8.

15

06 - Related SWEs

Include Page
8.

15

06 - Related SM
8.

15

06 - Related SM

Include Page
8.

15

06 - Related Activities
8.

15

06 - Related Activities

8.
16 - SA Products
07 - Software Fault Tree Analysis

Include Page
8.

16

07 - Related SWEs
8.

16

07 - Related SWEs

Include Page
8.

16

07 - Related SM
8.

16

07 - Related SM

Include Page
8.

16

07 - Related Activities
8.

16

07 - Related Activities

8.
17
08 - COTS Software Safety
Audit Checklists
Considerations

Include Page
8.

17

08 - Related SWEs
8.

17

08 - Related SWEs

Include Page
8.

17

08 - Related SM
8.

17

08 - Related SM

Include Page
8.

17

08 - Related Activities
8.

17

08 - Related Activities

8.
18 - SA Suggested Metrics
9 - Software Safety Analysis

Include Page
8.

18

09 - Related SWEs
8.

18

09 - Related SWEs

Include Page
8.

18

09 - Related SM
8.

18

09 - Related SM

Include Page
8.

18

09 - Related Activities
8.

18

09 - Related Activities

8.
19 - Dead / Dormant Code and Safety-Critical Software
10 - Facility Software with Safety Considerations

Include Page
8.

19

10 - Related SWEs
8.

19

10 - Related SWEs

Include Page
8.

19

10 - Related SM
8.

19

10 - Related SM

Include Page
8.

19

10 - Related Activities
8.

19

10 - Related Activities

8.
20 - Safety Specific Activities in Each Phase
11 - Auto-Generated Code

Include Page
8.

20

11 - Related SWEs
8.

20

11 - Related SWEs

Include Page
8.

20

11 - Related SM
8.

20

11 - Related SM

Include Page
8.

20

11 - Related Activities
8.

20

11 - Related Activities

8.
21
12 - Basics of Software
Hazard Causes
Auditing

Include Page
8.

21

12 - Related SWEs
8.

21

12 - Related SWEs

Include Page
8.

21

12 - Related SM
8.

21

12 - Related SM

Include Page
8.

21

12 - Related Activities
8.

21

12 - Related Activities

8.
22
13 -
Hazardous Commands
Test Witnessing

Include Page
8.

22

13 - Related SWEs
8.

22

13 - Related SWEs

Include Page
8.

22

13 - Related SM
8.

22

13 - Related SM

Include Page
8.

22

13 - Related Activities
8.

22

13 - Related Activities

8.
23 - Software Contents of a Certification of Flight Readiness
15 - SA Tasking Checklist Tool

Include Page
8.

23

15 - Related SWEs
8.

23

15 - Related SWEs

Include Page
8.

23

15 - Related SM
8.

23

15 - Related SM

Include Page
8.

23

15 - Related Activities
8.

23

15 - Related Activities

8.
51 - Software Assurance Plan
16 - SA Products

Include Page
8.

51

16 - Related SWEs
8.

51

16 - Related SWEs

Include Page
8.

51

16 - Related SM
8.

51

16 - Related SM

Include Page
8.

51

16 - Related Activities
8.

51

16 - Related Activities

8.
52
17 - Software
Assurance Status Reports
Safety Audit Checklists

Include Page
8.

52

17 - Related SWEs
8.

52

17 - Related SWEs

Include Page
8.

52

17 - Related SM
8.

52

17 - Related SM

Include Page
8.

52

17 - Related Activities
8.

52

17 - Related Activities

8.
53 - IV&V Project Execution Plan
18 - SA Suggested Metrics

Include Page
8.

53

18 - Related SWEs
8.

53

18 - Related SWEs

Include Page
8.

53

18 - Related SM
8.

53

18 - Related SM

Include Page
8.

53

18 - Related Activities
8.

53

18 - Related Activities

8.
54 - Software Requirements Analysis
19 - Dead / Dormant Code and Safety-Critical Software

Include Page
8.

54

19 - Related SWEs
8.

54

19 - Related SWEs

Include Page
8.

54

19 - Related SM
8.

54

19 - Related SM

Include Page
8.

54

19 - Related Activities
8.

54

19 - Related Activities

8.
55 - Software Design Analysis
20 - Safety Specific Activities in Each Phase

Include Page
8.

55

20 - Related SWEs
8.

55

20 - Related SWEs

Include Page
8.

55

20 - Related SM
8.

55

20 - Related SM

Include Page
8.

55

20 - Related Activities
8.

55

20 - Related Activities

8.
56 - Source Code Quality Analysis
21 - Software Hazard Causes

Include Page
8.

56

21 - Related SWEs
8.

56

21 - Related SWEs

Include Page
8.

56

21 - Related SM
8.

56

21 - Related SM

Include Page
8.

56

21 - Related Activities
8.

56

21 - Related Activities

8.
57
22 -
Testing Analysis
Hazardous Commands

Include Page
8.

57

22 - Related SWEs
8.

57

22 - Related SWEs

Include Page
8.

57

22 - Related SM
8.

57

22 - Related SM

Include Page
8.

57

22 - Related Activities
8.

57

22 - Related Activities

8.
58
23 - Software
Safety and Hazard Analysis
Contents of a Certification of Flight Readiness

Include Page
8.

58

23 - Related SWEs
8.

58

23 - Related SWEs

Include Page
8.

58

23 - Related SM
8.

58

23 - Related SM

Include Page
8.

58

23 - Related Activities
8.

58

23 - Related Activities

8.
59 - Audit Reports
24 - Software Assurance Risk

Include Page
SITE:8.

59

24 - Related SWEs
SITE:8.

59

24 - Related SWEs

Include Page
SITE:8.

59

24 - Related SM
SITE:8.

59

24 - Related SM

Include Page
SITE:8.

59

24 - Related Activities
SITE:8.

59

24 - Related Activities

9
8.
01 Software Design Principles
51 - Software Assurance Plan

Include Page

9

8.

01

51 - Related SWEs

9

8.

01

51 - Related SWEs

Include Page

9

8.

01

51 - Related SM

9

8.

01

51 - Related SM

Include Page

9

8.

01

51 - Related Activities

9

8.

01

51 - Related Activities

9
8.
02 Software Safety and Design Principles
52 - Software Assurance Status Reports

Include Page

9

8.

02

52 - Related SWEs

9

8.

02

52 - Related SWEs

Include Page

9

8.

02

52 - Related SM

9

8.

02

52 - Related SM

Include Page

9

8.

02

52 - Related Activities

9

8.

02

52 - Related Activities

9.03 Coding Standards
8.53 - IV&V Project Execution Plan

Include Page

9

8.

03

53 - Related SWEs

9

8.

03

53 - Related SWEs

Include Page

9

8.

03

53 - Related SM

9

8.

03

53 - Related SM

Include Page

9

8.

03

53 - Related Activities

9

8.

03

53 - Related Activities

9.04 Command Receipt Acknowledgement
8.54 - Software Requirements Analysis

Include Page

9

8.

04

54 - Related SWEs

9

8.

04

54 - Related SWEs

Include Page

9

8.

04

54 - Related SM

9

8.

04

54 - Related SM

Include Page

9

8.

04

54 - Related Activities

9

8.

04

54 - Related Activities

9.05 Data Interface Integrity
8.55 - Software Design Analysis

Include Page

9

8.

05

55 - Related SWEs

9

8.

05

55 - Related SWEs

Include Page

9

8.

05

55 - Related SM

9

8.

05

55 - Related SM

Include Page

9

8.

05

55 - Related Activities

9

8.

05

55 - Related Activities

9.06 Dead Code Exclusion
8.56 - Source Code Quality Analysis

Include Page

9

8.

06

56 - Related SWEs

9

8.

06

56 - Related SWEs

Include Page

9

8.

06

56 - Related SM

9

8.

06

56 - Related SM

Include Page

9

8.

06

56 - Related Activities

9

8.

06

56 - Related Activities

9.07 Fault Detection and Response
8.57 - Testing Analysis

Include Page

9

8.

07

57 - Related SWEs

9

8.

07

57 - Related SWEs

Include Page

9

8.

07

57 - Related SM

9

8.

07

57 - Related SM

Include Page

9

8.

07

57 - Related Activities

9

8.

07

57 - Related Activities

9
8.
08 Flight Software Modification
58 - Software Safety and Hazard Analysis

Include Page

9

8.

08

58 - Related SWEs

9

8.

08

58 - Related SWEs

Include Page

9

8.

08

58 - Related SM

9

8.

08

58 - Related SM

Include Page

9

8.

08

58 - Related Activities

9

8.

08

58 - Related Activities

9.09 Incorrect Memory Use or Access
8.59 - Audit Reports

Include Page

9

8.

09

59 - Related SWEs

9

8.

09

59 - Related SWEs

Include Page

9

8.

09

59 - Related SM

9

8.

09

59 - Related SM

Include Page

9

8.

09

59 - Related Activities

9

8.

09

59 - Related Activities

9.
10 Initialization - Safe Mode
01 Software Design Principles

Include Page
9.

10

01 - Related SWEs
9.

10

01 - Related SWEs

Include Page
9.

10

01 - Related SM
9.

10

01 - Related SM

Include Page
9.

10

01 - Related Activities
9.

10

01 - Related Activities

9.
11 Invalid Data Handling
02 Software Safety and Design Principles

Include Page
9.

11

02 - Related SWEs
9.

11

02 - Related SWEs

Include Page
9.

11

02 - Related SM
9.

11

02 - Related SM

Include Page
9.

11

02 - Related Activities
9.

11

02 - Related Activities

9.
12 Resource Margins
03 Coding Standards

Include Page
9.

12

03 - Related SWEs
9.

12

03 - Related SWEs

Include Page
9.

12

03 - Related SM
9.

12

03 - Related SM

Include Page
9.

12

03 - Related Activities
9.

12

03 - Related Activities

9.
13 Resource Oversubscription
04 Command Receipt Acknowledgement

Include Page
9.

13

04 - Related SWEs
9.

13

04 - Related SWEs

Include Page
9.

13

04 - Related SM
9.

13

04 - Related SM

Include Page
9.

13

04 - Related Activities
9.

13

04 - Related Activities

9.
14 Resource Usage Measurement
05 Data Interface Integrity

Include Page
9.

14

05 - Related SWEs
9.

14

05 - Related SWEs

Include Page
9.

14

05 - Related SM
9.

14

05 - Related SM

Include Page
9.

14

05 - Related Activities
9.

14

05 - Related Activities

9.
15 Safe Transitions
06 Dead Code Exclusion

Include Page
9.

15

06 - Related SWEs
9.

15

06 - Related SWEs

Include Page
9.

15

06 - Related SM
9.

15

06 - Related SM

Include Page
9.

15

06 - Related Activities
9.

15

06 - Related Activities

9.
16 Thread Safety
07 Fault Detection and Response

Include Page
9.

16

07 - Related SWEs
9.

16

07 - Related SWEs

Include Page
9.

16

07 - Related SM
9.

16

07 - Related SM

Include Page
9.

16

07 - Related Activities
9.

16

07 - Related Activities

9.
17 Toggle Commands
08 Flight Software Modification

Include Page
9.

17

08 - Related SWEs
9.

17

08 - Related SWEs

Include Page
9.

17

08 - Related SM
9.

17

08 - Related SM

Include Page
9.

17

08 - Related Activities
9.

17

08 - Related Activities

5.01 - CR-PR - Software Change Request - Problem Report
9.09 Incorrect Memory Use or Access

Include Page

5

9.

01

09 - Related SWEs

5

9.

01

09 - Related SWEs

Include Page

5

9.

01

09 - Related SM

5

9.

01

09 - Related SM

Include Page

5

9.

01

09 - Related Activities

5

9.

01

09 - Related Activities

5
9.
02 - IDD - Interface Design Description
10 Initialization - Safe Mode

Include Page

5

9.

02

10 - Related SWEs

5

9.

02

10 - Related SWEs

Include Page

5

9.

02

10 - Related SM

5

9.

02

10 - Related SM

Include Page

5

9.

02

10 - Related Activities

5

9.

02

10 - Related Activities

5.03 - Inspect - Software Inspection, Peer Reviews, Inspections
9.11 Invalid Data Handling

Include Page

5

9.

03

11 - Related SWEs

5

9.

03

11 - Related SWEs

Include Page

5

9.

03

11 - Related SM

5

9.

03

11 - Related SM

Include Page

5

9.

03

11 - Related Activities

5

9.

03

11 - Related Activities

5.04 - Maint - Software Maintenance Plan
9.12 Resource Margins

Include Page
9.12

Include Page5.04

- Related SWEs

5

9.

04

12 - Related SWEs

Include Page

5

9.

04

12 - Related SM

5

9.

04

12 - Related SM

Include Page

5

9.

04

12 - Related Activities

5

9.

04

12 - Related Activities

5.05 - Metrics - Software Metrics Report
9.13 Resource Oversubscription

Include Page

5

9.

05

13 - Related SWEs

5

9.

05

13 - Related SWEs

Include Page

5

9.

05

13 - Related SM

5

9.

05

13 - Related SM

Include Page

5

9.

05

13 - Related Activities

5

9.

05

13 - Related Activities

5.06 - SCMP - Software Configuration Management Plan
9.14 Resource Usage Measurement

Include Page

5

9.

06

14 - Related SWEs

5

9.

06

14 - Related SWEs

Include Page

5

9.

06

14 - Related SM

5

9.

06

14 - Related SM

Include Page

5

9.

06

14 - Related Activities

5

9.

06

14 - Related Activities

5.07 - SDD - Software Data Dictionary
9.15 Safe Transitions

Include Page

5

9.

07

15 - Related SWEs

5

9.

07

15 - Related SWEs

Include Page

5

9.

07

15 - Related SM

5

9.

07

15 - Related SM

Include Page

5

9.

07

15 - Related Activities

5

9.

07

15 - Related Activities

5.08 - SDP-SMP - Software Development - Management Plan
9.16 Thread Safety

Include Page

5

9.

08

16 - Related SWEs

5

9.

08

16 - Related SWEs

Include Page

5

9.

08

16 - Related SM

5

9.

08

16 - Related SM

Include Page

5

9.

08

16 - Related Activities

5

9.

08

16 - Related Activities

5.09 - SRS - Software Requirements Specification
9.17 Toggle Commands

Include Page

5

9.

09

17 - Related SWEs

5

9.

09

17 - Related SWEs

Include Page

5

9.

09

17 - Related SM

5

9.

09

17 - Related SM

Include Page

5

9.

09

17 - Related Activities

5

9.

09

17 - Related Activities

5.
10
01 - CR-
STP
PR - Software
Test Plan
Change Request - Problem Report

Include Page
5.

10

01 - Related SWEs
5.

10

01 - Related SWEs

Include Page
5.

10

01 - Related SM
5.

10

01 - Related SM

Include Page
5.

10

01 - Related Activities
5.

10

01 - Related Activities

5.
11
02 -
STR - Software Test Report
IDD - Interface Design Description

Include Page
5.

11

02 - Related SWEs
5.

11

02 - Related SWEs

Include Page
5.

11

02 - Related SM
5.

11

02 - Related SM

Include Page
5.

11

02 - Related Activities
5.

11

02 - Related Activities

5.
12
03 -
SUM
Inspect - Software
User Manual
Inspection, Peer Reviews, Inspections

Include Page
5.

12

03 - Related SWEs
5.

12

03 - Related SWEs

Include Page
5.

12

03 - Related SM
5.

12

03 - Related SM

Include Page
5.

12

03 - Related Activities
5.

12

03 - Related Activities

5.
13
04 -
SwDD
Maint - Software
Design Description
Maintenance Plan

Include Page
5.

13

04 - Related SWEs
5.

13

04 - Related SWEs

Include Page
5.

13

04 - Related SM
5.

13

04 - Related SM

Include Page
5.

13

04 - Related Activities
5.

13

04 - Related Activities

5.
14
05 -
Test
Metrics - Software
Test Procedures
Metrics Report

Include Page
5.

14

05 - Related SWEs
5.

14

05 - Related SWEs

Include Page
5.

14

05 - Related SM
5.

14

05 - Related SM

Include Page
5.

14

05 - Related Activities
5.

14

05 - Related Activities

5.
15
06 -
Train
SCMP - Software
Training
Configuration Management Plan

Include Page
5.

15

06 - Related SWEs
5.

15

06 - Related SWEs

Include Page
5.

15

06 - Related SM
5.

15

06 - Related SM

Include Page
5.

15

06 - Related Activities
5.

15

06 - Related Activities

5.
16
07 -
VDD - Version Description Document
SDD - Software Data Dictionary

Include Page
5.

16

07 - Related SWEs
5.

16

07 - Related SWEs

Include Page
5.

16

07 - Related SM
5.

16

07 - Related SM

Include Page
5.

16

07 - Related Activities
5.

16

07 - Related Activities

5.
17
08 - SDP-SMP - Software
Assurance
Development - Management Plan
Minimum Content

n/a

n/a

Include Page
5.08 - Related SWEs

A.02 Software Assurance and Software Safety

5.

18 - Safety Plan Minimum Content

08 - Related SWEs

Include Page
5.08 - Related SM
5.08 - Related SM

Include Page
5.08 - Related Activities
5.08 - Related Activities

5.09 - SRS - Software Requirements Specification

Include Page
5.09 - Related SWEs
5.09 - Related SWEs

Include Page
5.09 - Related SM
5.09 - Related SM

Include Page
5.09 - Related Activities
5.09 - Related Activities

5.10 - STP - Software Test Plan

Include Page
5.10 - Related SWEs
5.10 - Related SWEs

Include Page
5.10 - Related SM
5.10 - Related SM

Include Page
5.10 - Related Activities
5.10 - Related Activities

5.11 - STR - Software Test Report

Include Page
5.11 - Related SWEs
5.11 - Related SWEs

Include Page
5.11 - Related SM
5.11 - Related SM

Include Page
5.11 - Related Activities
5.11 - Related Activities

5.12 - SUM - Software User Manual

Include Page
5.12 - Related SWEs
5.12 - Related SWEs

Include Page
5.12 - Related SM
5.12 - Related SM

Include Page
5.12 - Related Activities
5.12 - Related Activities

5.13 - SwDD - Software Design Description

Include Page
5.13 - Related SWEs
5.13 - Related SWEs

Include Page
5.13 - Related SM
5.13 - Related SM

Include Page
5.13 - Related Activities
5.13 - Related Activities

5.14 - Test - Software Test Procedures

Include Page
5.14 - Related SWEs
5.14 - Related SWEs

Include Page
5.14 - Related SM
5.14 - Related SM

Include Page
5.14 - Related Activities
5.14 - Related Activities

5.15 - Train - Software Training Plan

Include Page
5.15 - Related SWEs
5.15 - Related SWEs

Include Page
5.15 - Related SM
5.15 - Related SM

Include Page
5.15 - Related Activities
5.15 - Related Activities

5.16 - VDD - Version Description Document

Include Page
5.16 - Related SWEs
5.16 - Related SWEs

Include Page
5.16 - Related SM
5.16 - Related SM

Include Page
5.16 - Related Activities
5.16 - Related Activities

5.17 - Software Assurance Plan Minimum Content

n/a

n/a

5.18 - Safety Plan Minimum Content

n/a

n/a

5.19 - Software Assurance Status Report Minimum Content

n/a

n/a

5.20 - IV&V Project Execution Plan Minimum Content

n/a

n/a

5.21 - Software Requirements Analysis Report Minimum Content

n/a

n/a

5.22 - Software Design Analysis Report Minimum Content

n/a

n/a

5.23 - Testing Analysis Report Minimum Content

n/a

n/a

5.24 - Hazard Report Minimum Content

n/a

n/a

5.25 - Audit Report Minimum Content

n/a

n/a

5.26 - Source Code Quality Analysis Report Minimum Content

n/a

n/a

6.1 - Design for Safety Checklist

Include Page
6.1 - Related SWEs
6.1 - Related SWEs

Include Page
6.1 - Related SM
6.1 - Related SM

Include Page
6.1 - Related Activities
6.1 - Related Activities

6.2 - Checklist for General Software Safety Requirements

Include Page
6.2 - Related SWEs
6.2 - Related SWEs

Include Page
6.2 - Related SM
6.2 - Related SM

Include Page
6.2 - Related Activities
6.2 - Related Activities

6.3 - Checklist for Choosing a Real Time Operating System (RTOS)

Include Page
6.3 - Related SWEs
6.3 - Related SWEs

Include Page
6.3 - Related SM
6.3 - Related SM

Include Page
6.3 - Related Activities
6.3 - Related Activities

6.4 - Checklist for Choosing Off-The Shelf Software (OTS)

Include Page
6.4 - Related SWEs
6.4 - Related SWEs

Include Page
6.4 - Related SM
6.4 - Related SM

Include Page
6.4 - Related Activities
6.4 - Related Activities

6.5 - Checklist for C Programming Practices

Include Page
6.5 - Related SWEs
6.5 - Related SWEs

Include Page
6.5 - Related SM
6.5 - Related SM

Include Page
6.5 - Related Activities
6.5 - Related Activities

6.6 - Checklist for C++ Programming Practices

Include Page
6.6 - Related SWEs
6.6 - Related SWEs

Include Page
6.6 - Related SM
6.6 - Related SM

Include Page
6.6 - Related Activities
6.6 - Related Activities

6.7 - Checklist for Ada Programming Practices

Include Page
6.7 - Related SWEs
6.7 - Related SWEs

Include Page
6.7 - Related SM
6.7 - Related SM

Include Page
6.7 - Related Activities
6.7 - Related Activities

6.8 - Checklist for Fortran Programming Practices

Include Page
6.8 - Related SWEs
6.8 - Related SWEs

Include Page
6.8 - Related SM
6.8 - Related SM

Include Page
6.8 - Related Activities
6.8 - Related Activities

6.9 - Checklist for Generic (Non-Language-Specific) Programming Practices

Include Page
6.9 - Related SWEs
6.9 - Related SWEs

Include Page
6.9 - Related SM
6.9 - Related SM

Include Page
6.9 - Related Activities
6.9 - Related Activities

6.10 - Checklist for General Good Programming Practices

Include Page
6.10 - Related SWEs
6.10 - Related SWEs

Include Page
6.10 - Related SM
6.10 - Related SM

Include Page
6.10 - Related Activities
6.10 - Related Activities

6.11 - Examples of Programming Practices for Exception Handling

Include Page
6.11 - Related SWEs
6.11 - Related SWEs

Include Page
6.11 - Related SM
6.11 - Related SM

Include Page
6.11 - Related Activities
6.11 - Related Activities

PAT-003 - Functional Requirements Checklist

Include Page
SITE:PAT-003 - Related SWEs
SITE:PAT-003 - Related SWEs

Include Page
SITE:PAT-002 - Related SM
SITE:PAT-002 - Related SM

Include Page
SITE:PAT-002 - Related Activities
SITE:PAT-002 - Related Activities

PAT-004 - Safety Requirements Analysis Checklist

Include Page
SITE:PAT-004 - Related SWEs
SITE:PAT-004 - Related SWEs

Include Page
SITE:PAT-004 - Related SM
SITE:PAT-004 - Related SM

Include Page
SITE:PAT-004 - Related Activities
SITE:PAT-004 - Related Activities

PAT-005 - Software Component Design Analysis Checklist

Include Page
SITE:PAT-005 - Related SWEs
SITE:PAT-005 - Related SWEs

Include Page
SITE:PAT-005 - Related SM
SITE:PAT-005 - Related SM

Include Page
SITE:PAT-005 - Related Activities
SITE:PAT-005 - Related Activities

PAT-006 - Design Practices for Safety

Include Page
SITE:PAT-006 - Related SWEs
SITE:PAT-006 - Related SWEs

Include Page
SITE:PAT-006 - Related SM
SITE:PAT-006 - Related SM

Include Page
SITE:PAT-006 - Related Activities
SITE:PAT-006 - Related Activities

PAT-007 - Checklist for General Software Safety Requirements

Include Page
SITE:PAT-007 - Related SWEs
SITE:PAT-007 - Related SWEs

Include Page
SITE:PAT-007 - Related SM
SITE:PAT-007 - Related SM

Include Page
SITE:PAT-007 - Related Activities
SITE:PAT-007 - Related Activities

PAT-008 - Safety Considerations for Design Peer Reviews Checklist

Include Page
SITE:PAT-008 - Related SWEs
SITE:PAT-008 - Related SWEs

Include Page
SITE:PAT-008 - Related SM
SITE:PAT-008 - Related SM

Include Page
SITE:PAT-008 - Related Activities
SITE:PAT-008 - Related Activities

PAT-009 - Software Safety Process Audit

Include Page
SITE:PAT-009 - Related SWEs
SITE:PAT-009 - Related SWEs

Include Page
SITE:PAT-006 - Related SM
SITE:PAT-006 - Related SM

Include Page
SITE:PAT-006 - Related Activities
SITE:PAT-006 - Related Activities

PAT-010 - Software Safety Activities for Internal Audit

Include Page
SITE:PAT-010 - Related SWEs
SITE:PAT-010 - Related SWEs

Include Page
SITE:PAT-010 - Related SM
SITE:PAT-010 - Related SM

Include Page
SITE:PAT-010 - Related Activities
SITE:PAT-010 - Related Activities

PAT-011 - ISO 27001-2013 Audit Checklist

Include Page
SITE:PAT-011 - Related SWEs
SITE:PAT-011 - Related SWEs

Include Page
SITE:PAT-011 - Related SM
SITE:PAT-011 - Related SM

Include Page
SITE:PAT-011 - Related Activities
SITE:PAT-011 - Related Activities

PAT-012 - Detection of Adversarial Actions - Retired

Include Page
SITE:PAT-012 - Related SWEs
SITE:PAT-012 - Related SWEs

Include Page
SITE:PAT-012 - Related SM
SITE:PAT-012 - Related SM

Include Page
SITE:PAT-012 - Related Activities
SITE:PAT-012 - Related Activities

PAT-013 - Software Requirements Checklist

Include Page
SITE:PAT-013 - Related SWEs
SITE:PAT-013 - Related SWEs

Include Page
SITE:PAT-013 - Related SM
SITE:PAT-013 - Related SM

Include Page
SITE:PAT-013 - Related Activities
SITE:PAT-013 - Related Activities

PAT-014 - Architecture Design Checklist

Include Page
SITE:PAT-014 - Related SWEs
SITE:PAT-014 - Related SWEs

Include Page
SITE:PAT-014 - Related SM
SITE:PAT-014 - Related SM

Include Page
SITE:PAT-014 - Related Activities
SITE:PAT-014 - Related Activities

PAT-015 - Detailed Design Checklist

Include Page
SITE:PAT-015 - Related SWEs
SITE:PAT-015 - Related SWEs

Include Page
SITE:PAT-015 - Related SM
SITE:PAT-015 - Related SM

Include Page
SITE:PAT-015 - Related Activities
SITE:PAT-015 - Related Activities

PAT-016 - Functional Design Checklist

Include Page
SITE:PAT-016 - Related SWEs
SITE:PAT-016 - Related SWEs

Include Page
SITE:PAT-016 - Related SM
SITE:PAT-016 - Related SM

Include Page
SITE:PAT-016 - Related Activities
SITE:PAT-016 - Related Activities

PAT-017 - C Code Inspection Checklist

Include Page
SITE:PAT-017 - Related SWEs
SITE:PAT-017 - Related SWEs

Include Page
SITE:PAT-017 - Related SM
SITE:PAT-017 - Related SM

Include Page
SITE:PAT-017 - Related Activities
SITE:PAT-017 - Related Activities

PAT-018 - Test Plan Checklist

Include Page
SITE:PAT-018 - Related SWEs
SITE:PAT-018 - Related SWEs

Include Page
SITE:PAT-018 - Related SM
SITE:PAT-018 - Related SM

Include Page
SITE:PAT-018 - Related Activities
SITE:PAT-018 - Related Activities

PAT-019 - Test Procedure Checklist

Include Page
SITE:PAT-019 - Related SWEs
SITE:PAT-019 - Related SWEs

Include Page
SITE:PAT-019 - Related SM
SITE:PAT-019 - Related SM

Include Page
SITE:PAT-019 - Related Activities
SITE:PAT-019 - Related Activities

PAT-020 - Examples of Interface Problems

Include Page
SITE:PAT-020 - Related SWEs
SITE:PAT-020 - Related SWEs

Include Page
SITE:PAT-020 - Related SM
SITE:PAT-020 - Related SM

Include Page
SITE:PAT-020 - Related Activities
SITE:PAT-020 - Related Activities

PAT-021 - SADESIGN Checklist

Include Page
SITE:PAT-021 - Related SWEs
SITE:PAT-021 - Related SWEs

Include Page
SITE:PAT-021 - Related SM
SITE:PAT-021 - Related SM

Include Page
SITE:PAT-021 - Related Activities
SITE:PAT-021 - Related Activities

PAT-022 - Programming Practices Checklist

Include Page
SITE:PAT-022 - Related SWEs
SITE:PAT-022 - Related SWEs

Include Page
SITE:PAT-022 - Related SM
SITE:PAT-022 - Related SM

Include Page
SITE:PAT-022 - Related Activities
SITE:PAT-022 - Related Activities

PAT-023 - Preparing for a SARB Checklist

Include Page
SITE:PAT-023 - Related SWEs
SITE:PAT-023 - Related SWEs

Include Page
SITE:PAT-023 - Related SM
SITE:PAT-023 - Related SM

Include Page
SITE:PAT-023 - Related Activities
SITE:PAT-023 - Related Activities

PAT-024 - Checklist for Choosing Off-The Shelf Software

Include Page
SITE:PAT-024 - Related SWEs
SITE:PAT-024 - Related SWEs

Include Page
SITE:PAT-024 - Related SM
SITE:PAT-024 - Related SM

Include Page
SITE:PAT-024 - Related Activities
SITE:PAT-024 - Related Activities

PAT-025 - Checklist for Choosing a Real Time Operating System (RTOS)

Include Page
SITE:PAT-025 - Related SWEs
SITE:PAT-025 - Related SWEs

Include Page
SITE:PAT-025 - Related SM
SITE:PAT-025 - Related SM

Include Page
SITE:PAT-025 - Related Activities
SITE:PAT-025 - Related Activities

PAT-026 - Test Review Checklist For Test Leads

Include Page
SITE:PAT-026 - Related SWEs
SITE:PAT-026 - Related SWEs

Include Page
SITE:PAT-026 - Related SM
SITE:PAT-026 - Related SM

Include Page
SITE:PAT-026 - Related Activities
SITE:PAT-026 - Related Activities

PAT-027 - Test Review Checklist For Review Teams

Include Page
SITE:PAT-027 - Related SWEs
SITE:PAT-027 - Related SWEs

Include Page
SITE:PAT-027 - Related SM
SITE:PAT-027 - Related SM

Include Page
SITE:PAT-027 - Related Activities
SITE:PAT-027 - Related Activities

PAT-028 - NPR 7150.2D Compliance Matrix

Include Page
SITE:PAT-028 - Related SWEs
SITE:PAT-028 - Related SWEs

Include Page
SITE:PAT-028 - Related SM
SITE:PAT-028 - Related SM

Include Page
SITE:PAT-028 - Related Activities
SITE:PAT-028 - Related Activities

PAT-029 - Software Architecture Review Board Checklist

Include Page
SITE:PAT-029 - Related SWEs
SITE:PAT-029 - Related SWEs

Include Page
SITE:PAT-029 - Related SM
SITE:PAT-029 - Related SM

Include Page
SITE:PAT-029 - Related Activities
SITE:PAT-029 - Related Activities

PAT-030 - SARB Review Checklist with Guidance

Include Page
SITE:PAT-030 - Related SWEs
SITE:PAT-030 - Related SWEs

Include Page
SITE:PAT-030 - Related SM
SITE:PAT-030 - Related SM

Include Page
SITE:PAT-030 - Related Activities
SITE:PAT-030 - Related Activities

PAT-031 - Critical Design Analysis Checklist

Include Page
SITE:PAT-031 - Related SWEs
SITE:PAT-031 - Related SWEs

Include Page
SITE:PAT-031 - Related SM
SITE:PAT-031 - Related SM

Include Page
SITE:PAT-031 - Related Activities
SITE:PAT-031 - Related Activities

PAT-032 - Considerations When Using Interrupts

Include Page
SITE:PAT-032 - Related SWEs
SITE:PAT-032 - Related SWEs

Include Page
SITE:PAT-032 - Related SM
SITE:PAT-032 - Related SM

Include Page
SITE:PAT-032 - Related Activities
SITE:PAT-032 - Related Activities

PAT-033 - TASKS NEEDING OBJECTIVE EVIDENCE

Include Page
SITE:PAT-033 - Related SWEs
SITE:PAT-033 - Related SWEs

Include Page
SITE:PAT-033 - Related SM
SITE:PAT-033 - Related SM

Include Page
SITE:PAT-033 - Related Activities
SITE:PAT-033 - Related Activities

PAT-034 - SA Requirements Analysis Checklist

Include Page
SITE:PAT-034 - Related SWEs
SITE:PAT-034 - Related SWEs

Include Page
SITE:PAT-034 - Related SM
SITE:PAT-034 - Related SM

Include Page
SITE:PAT-034 - Related Activities
SITE:PAT-034 - Related Activities

PAT-037 - Configuration Management Process Audit

Include Page
SITE:PAT-037 - Related SWEs
SITE:PAT-037 - Related SWEs

Include Page
SITE:PAT-037 - Related SM
SITE:PAT-037 - Related SM

Include Page
SITE:PAT-037 - Related Activities
SITE:PAT-037 - Related Activities

n/a

n/a

5.19 - Software Assurance Status Report Minimum Content

n/a

n/a

5.20 - IV&V Project Execution Plan Minimum Content

n/a

n/a

5.21 - Software Requirements Analysis Report Minimum Content

n/a

n/a

5.22 - Software Design Analysis Report Minimum Content

n/a

n/a

5.23 - Testing Analysis Report Minimum Content

n/a

n/a

5.24 - Hazard Report Minimum Content

n/a

n/a

5.25 - Audit Report Minimum Content

n/a

n/a

5.26 - Source Code Quality Analysis Report Minimum Content

n/a

n/a

A.06 Software Testing