SWE-133 - Last used in rev NPR 7150.2B
| Rev | SWE Statement |
|---|---|
| A | 2.2.8.3 The project, in conjunction with the Safety and Mission Assurance organization, shall determine the software safety criticality in accordance with NASA-STD-8739.8. |
| Difference between A and B | Changed the NASA standard. |
| B | 3.5.3 The project manager, in conjunction with the Safety and Mission Assurance organization, shall determine the software safety criticality in accordance with NASA-STD-8719.13. |
| Difference between B and C | Last used in Rev B; requirement merged into SWE-205. |
| C | DELETED |


