Rev | SWE Statement |
---|---|
A | 3.4.7 The project shall update Software Test Plan(s) and Software Test Procedure(s) to be consistent with software requirements. |
Difference between A and B | No change |
B | 4.5.8 The project manager shall update software test plan(s) and software test procedure(s) to be consistent with software requirements. |
Difference between B and C | No change |
C | 4.5.7 The project manager shall update the software test plan(s) and the software test procedure(s) to be consistent with software requirements. |
Difference between C and D | Editorial clarification (added verification plans). |
D | 4.5.7 The project manager shall update the software test and verification plan(s) and procedure(s) to be consistent with software requirements. |