SWE-069 - Last used in rev NPR 7150.2B
| Rev | SWE Statement |
|---|---|
| A | 3.4.5 The project shall document defects identified during testing and track to closure. |
| Difference between A and B | No change |
| B | 4.5.6 The project manager shall record defects identified during testing and track to closure. |
| Difference between B and C | Last used in Rev B; Requirement covered by SWE-065c and SWE-201. |
| C | DELETED |