SWE-039 - Last used in rev NPR 7150.2D
| Rev | SWE Statement |
|---|---|
| A | 2.6.1.1 The project shall require the software supplier(s) to provide insight into software development and test activities; at a minimum the following activities are required: monitoring integration, review of the verification adequacy, review of trade study data and results, auditing the software development process, participation in software reviews and systems and software technical interchange meetings. |
| Difference between A and B | No change |
| B | 3.12.8 The project manager shall require the software supplier(s) to provide insight into software development and test activities; at a minimum, the software supplier(s) will be required to allow the project manager or designate to:
|
| Difference between B and C | Changed "supplier(s)" to "developer(s)"; |
| C | 3.1.8 The project manager shall require the software developer(s) to periodically report status and provide insight into software development and test activities; at a minimum, the software developer(s) will be required to allow the project manager and software assurance personnel to: |
| Difference between C and D | No change |
| D | 3.1.8 The project manager shall require the software developer(s) to periodically report status and provide insight into software development and test activities; at a minimum, the software developer(s) will be required to allow the project manager and software assurance personnel to: |