SWE-030 - Last used in rev NPR 7150.2B
| Rev | SWE Statement |
|---|---|
| A | 2.4.3 The project shall record, address, and track to closure the results of software verification activities. |
| Difference between A and B | No change |
| B | 3.10.4 The project manager shall record, address, and track to closure the results of software verification activities. |
| Difference between B and C | Last used in Rev B; Requirement covered by SWE-024, SWE-065c, SWE-068, and SWE-194. |
| C | DELETED |


