1. Requirements

4.6.4 The project manager shall complete, prior to delivery, verification that all software requirements identified for this delivery have been met, that all approved changes have been implemented and that all defects designated for resolution prior to delivery have been resolved.

1.1 Notes

NPR 7150.2, NASA Software Engineering Requirements, does not include any notes for this requirement.

1.2 Applicability Across Classes

 

2. Rationale

text


3. Guidance

Text



4. Small Projects

No additional guidance is available for small projects.

5. Resources

5.1 References

 

Enter necessary modifications to be made in the table below:

SWEREFs to be addedSWEREFS to be deleted


SWEREFs called out in text: none

SWEREFs NOT called out in text but listed as germane: none

5.2 Tools

 

6. Lessons Learned

There are currently no Lessons Learned identified for this requirement.


7. Software Assurance

text