Lifecycle Review Entry/Exit Criteria Guidance

This section identifies criteria for the entrance into and the successful completion of one of the 13 lifecycle reviews from NPR 7123.1 Appendix G. It is organized by the 13 reviews chosen and includes the following information: entrance criteria, exit criteria, software community responsibilities (e.g., SDP/SMP), software community contributions to system activities/products (e.g., Project Plan).
Material was also added and adapted from these other sources:

Notes: The software requirements review (SwRR) is not included in 7123.1, but is often used in software projects, so it is included here. The following reviews were not included because they did not have any apparent correlation to 7150.2A: Program/System Requirements Review, Program/System Definition Review, Post-Launch Assessment Review, Critical Event Readiness Review, Post-Flight Assessment Review, Decommission Review, Periodic Technical Review. (Tables G-1,2,15-19)

Mission Concept Review (MCR)

Entrance Criteria

Exit/Success Criteria

Systems Requirements Review (SRR)

Entrance Criteria


Exit/Success Criteria

Software Requirements Review (SwRR)

Entrance Criteria

Exit/Success Criteria

Mission Definition Review (MDR)

Entrance Criteria

Exit/Success Criteria


System Definition Review (SDR)

Entrance Criteria


Exit/Success Criteria

Preliminary Design Review (PDR)

Entrance Criteria

Exit/Success Criteria


Critical Design Review (CDR)

Entrance Criteria

Exit/Success Criteria

Production Readiness Review (PRR)

A PRR is held for FS&GS projects developing or acquiring multiple or similar systems greater than three or as determined by the project. The PRR determines the readiness of the system developers to efficiently produce the required number of systems. It ensures that the production plans; fabrication, assembly, and integration enabling products; and personnel are in place and ready to begin production. - NPR 7123.1

Entrance Criteria

Exit/Success Criteria

System Integration Review (SIR)

Entrance Criteria

Exit/Success Criteria


Test Readiness Review (TRR)

Entrance Criteria

Exit/Success Criteria

System Acceptance Review (SAR)

Entrance Criteria

Exit/Success Criteria

Operational Readiness Review (ORR)

Entrance Criteria

Exit/Success Criteria


Flight Readiness Review (FRR)

Entrance Criteria

Exit/Success Criteria