6.2 Existing Structure in SWEs with Tab 7 Software Assurance

SWEs that are from Chapters 3 through 5 of NPR 7150.2D have a Tab 7 for Software Assurance content. The tab 7 information defines a structure for providing guidance to Software Assurance team members for satisfying a SWE. This tab brings into focus the parallel nature of Software Assurance and Software Development work. For every requirement in NPR 7150.2 for Software Development, there are some tasks for Software Assurance to accomplish. The organization of tab 7 is: 

  1. Tasking for Software Assurance - one or more tasks derived from the NPR 7150.2 Requirement and specifically included in NASA-STD-8739.8. 
  2. Software Assurance Products - one or more work products created as a result of accomplishing the tasking. 
  3. Metrics - example metrics that could be collected (including some that must be collected) as a result of accomplishing the tasking. 
  4. Guidance - Additional information regarding how the tasks could be accomplished. In some cases, the guidance includes step by step instructions on accomplishing the tasks. 

Using SWE-058 as an example, we see 5 tasks assigned to SA: 

6.3 Expanding the Notion of Tasking into the SWE Structure

For this example, we will work with the page: Copy of SWE-058 - Detailed Design with new tab 4 . 

If we consider expanding the notion of Tasks into the current SWEs, we would have to look for a place to put them. Without a major restructuring of the tabs, we could consider putting them into tab 4. This would require renaming this tab from "Small Projects" to something like "Project Tasks". Initially, we may leave the existing text in tab 4 and just add to it. The preamble for this tab might be:

"Project Tasks are recommended for projects where this SWE is applicable. They are derived from the requirement. Suggestions for completing the tasks and producing the recommended work products are based on the guidance in tab 3."

The Guidance for SWE-058 contains information which could be interpreted as tasks for Software Development team members. 

For the new tab 4 content we might consider the following: 


4.1 Tasking for Software Development

Guidance for each task is available in tab 3. 

  1. Assess Design Readiness 
  2. Establish Coding Standards and Processes
  3. Establish Project Specific Design Considerations
  4. Establish Detailed Design Documentation and Progress Reviews
  5. Establish Design Maintenance Processes and Mechanisms

4.2 Software Development Work Products

  1. Software Development Process - which includes details on the Design Process to be followed. 
  2. List of design components including when they are expected to be available - as input to Development Schedule
  3. List of methods, tools, standards, and guidelines for your project. 
  4. List of training and experience required by team members to perform the design and development work. 

4.3 Metrics

Suggested metrics are listed below. Items in bold are strongly recommended for implementation in order to provide benefit for tracking and assessing completion of the work. 

  • # of architectural issues identified vs. number closed.
  • # of design issues found versus the number of design issues resolved.
  • # of requirement issues (Open, Closed) over time.
  • # of non-conformances identified by life cycle phase over time.
  • # of software work product Non-Conformances identified by life cycle phase over time


This tasking was derived using

6.4 Comparing Tasks 

Looking at the Development Tasks above, it is clear that there is not a one to one correspondence between Development Tasks and Assurance Tasks. The table below demonstrates this: 

Development TaskAssurance Task

 1. Assess Design Readiness 

 2. Establish Coding Standards and Processes

 3. Establish Project Specific Design Considerations

 4. Establish Detailed Design Documentation and Progress Reviews

 5. Establish Design Maintenance Processes and Mechanisms

A similar disparity can be seen with the Work products for the two areas: 

Development Work ProductsAssurance Work Products
  1. Software Development Process - which includes details on the Design Process to be followed. 
  2. List of design components including when they are expected to be available - as input to Development Schedule
  3. List of methods, tools, standards, and guidelines for your project. 
  4. List of training and experience required by team members to perform the design and development work. 
  1. Software Design Analysis
  2. Results of software assurance design analysis, including assessments in Tasks 1, 2, and 3. 
  3. List of any identified design risks and issues.


When building the Combined activity it will be necessary to have tabs for both Development and Assurance. 

6.5 Activity View of Software Design Activity

One approach to this might be to combine the Development and Assurance elements into a single activity to reinforce the notion that the two groups are expected to work in a coordinated way even though not in a closely coupled way. To show this, look at the Activity - Software Design page. This page shows the combination of Development Tasks and Assurance Tasks in a single activity. 

The activity "Software Design" was selected because it has only one SWE associated with it. Only one SWE is needed to show how it develops in the sections of the activity. It is more straight forward that trying to develop an activity like "Life Cycle  Planning" which has many SWEs. 

The content for each tab is listed here. in order to avoid duplicating a lot of text, the existing SWEs and Topics are referenced and linked as much as possible. A minimal amount of text is copied into the Activity page. In many cases, excerpts are used to bring text in. This will minimize the original authoring of a lot of text. 

6.5.1 Tab 1 Introduction

This section contains a quote from NPR 7150.2D to describe what the activity is all about. If a quote is not available (it was not defined in the NPR) then new text must be provided to describe the activity. 

6.5.2 Tab 2 Software Development Activity

This section focuses on SWEHB components aimed as supporting the Software Development Community. It organizes components into groups of page types. 

6.5.3 Tab 3 Software Assurance Activity

This tab brings out the relationship between Software Development and Software Assurance for the activity. Where tab 3 in the SWE provides guidance for Software Developers on how to satisfy the requirement, tab 7 provides guidance for Software Assurance on how to satisfy the requirement.

6.6 Special Topics Pages That Seem To Mimic Activities

In building the third Activity example, Activity - Software Design, It became apparent that there are some new pages in the SWEHB tat are different from the typical SWE or Topic. In the latter days of SWEHBVC some work was done on a small number of pages in the 7.18 - Documentation Guidance. They were moved into Topic 8.16 - SA Products. As these pages developed further, they became more than just a "minimum content" description. They blossomed into very detailed guidance pages, looking somewhat like activity descriptions. 

These pages have sections for: 

Certainly, all of these pages and content are valuable as topics for providing guidance on performing all types of work related activities. It may be somewhat of a challenge to accurately represent all of this content in the Activity format. Part of the concern is that it is currently under development and changes to the content will require that the Activities which point to them will need maintenance to keep up with the development in these areas. We will have to look carefully at these topics and come up with a way to include their content in Activities without getting too exhaustive in the Activity. Case in point,