


1. Requirements
4.4.5 The project shall report measurement analysis results periodically and allow access to measurement information by Center-defined organizational measurement programs.
1.1 Notes
NPR 7150.2A does not include any notes for this requirement.
1.2 Applicability Across Classes
Classes C-E and Safety Critical are labeled "P (Center) +SO". This means that this requirement applies to the safety-critical aspects of the software and that an approved Center defined process which meets a non-empty subset of this full requirement can be used to meet the intent of this requirement.
Class C and Not Safety Critical and Class G are labeled with "P (Center)". This means that a Center defined process which meets a non-empty subset of this full requirement can be used to meet the intent of this requirement.
Class F is labeled with "X (not OTS)". This means that this requirement does not apply to off-the-shelf software for these classes.
Class |
A_SC |
A_NSC |
B_SC |
B_NSC |
C_SC |
C_NSC |
D_SC |
D_NSC |
E_SC |
E_NSC |
F |
G |
H |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Applicable? |
|
|
|
|
|
P(C) |
|
|
|
|
|
P(C) |
|
Key: A_SC = Class A Software, Safety-Critical | A_NSC = Class A Software, Not Safety-Critical | ... | - Applicable |
- Not Applicable
X - Applicable with details, read above for more | P(C) - P(Center), follow center requirements or procedures