4.2.1 The project shall identify, analyze, plan, track, control, communicate, and document software risks in accordance with NPR 8000.4, Agency Risk Management Procedural Requirements. A project needs to include an assessment of the risk that any untested code poses to the system or subsystem. Classes C through E and Safety Critical are labeled, "SO." This means that this requirement applies to the safety-critical aspects of the software. Class G is labeled with "P (Center)." This means that an approved Center-defined process which meets a non-empty subset of the full requirement can be used to achieve this requirement. Class A_SC A_NSC B_SC B_NSC C_SC C_NSC D_SC D_NSC E_SC E_NSC F G H Applicable? X X X P(C) Key: A_SC = Class A Software, Safety-Critical | A_NSC = Class A Software, Not Safety-Critical | ... | - Applicable | - Not Applicable The purpose of risk management is to identify potential problems before they occur so that risk handling activities can be planned and invoked as needed across the life of the product or project. Risk handling activities are intended to mitigate adverse impacts on achieving the project's objectives. "Generically, risk management is a set of activities aimed at achieving success by proactively risk-informing the selection of decision alternatives and then managing the implementation risks associated with the selected alternative." 009 Identification and management of risks provide a basis for systematically examining changing situations over time to uncover and correct circumstances that impact the ability of the project to meet its objectives. NPR 7150.2 states: "Identifying major risks, both technical and managerial, and determining how to lessen the risk helps keep the software development process under control." 276 "Provide a description of the methods and procedures employed to identify, assess, monitor, and control areas of risk arising during the software assurance activities." 271 This recommendation could be extended to methods and procedures used to manage risk throughout all aspects of the software development life cycle. To ensure consistent application of risk management, NPR 7150.2 requires that risk management follow NPR 8000.4, Agency Risk Management Procedural Requirements 009. NPR 7150.2 also includes a list of steps to be included when a project plans its risk management strategy; these steps are common to continuous risk management. This diagram from NASA/SP-2007-6105, NASA Systems Engineering Handbook, 273 provides an overview of a risk management process: Guidance for each of the risk management steps is provided below. In addition to the guidance found in this Handbook, consult Center Process Asset Libraries (PALs) for Center-specific guidance and resources related to continuous risk management. Risk management activities begin during the project concept phase and continue through project retirement. Larger projects may have project leads with responsibility for risk management, but all project team members need to look for and bring risks to management's attention. Identify software risks When identifying software risks, consider the following insights and suggestions: Analyze software risks Once the team identifies the initial set of risks, analysis needs to be performed to determine the likelihood (probability) and severity of the consequences of each risk. When performing this analysis, many risk management guidebooks suggest including the following: Keep in mind that "a rare but severe risk contributor may warrant a response different from that warranted by a frequent, less severe contributor, even though both have the same expected consequences." 273 One analysis method is a probabilistic risk assessment (PRA). Per NASA/SP-2007-6105, NASA Systems Engineering Handbook 273, "PRA is a scenario-based risk assessment technique that quantifies the likelihoods of various possible undesired scenarios and their consequences, as well as the uncertainties in the likelihoods and consequences.... For additional information on probabilistic risk assessments, refer to [NPR 8705.5A, Technical Probabilistic Risk Assessment (PRA) Procedures Guide for Safety and Mission Success for NASA Programs and Projects]." (Editor's Note: NPR 8705.3 has been updated to NPR 8705.5A in this quotation.) Another recommendation is to model the scenarios and use those models to assess the consequences and determine the likelihood of a risk occurring. The results of this step are used to rank the identified risks and the possible alternatives for those risks so that informed plans can be put into place to address those risks. NASA/SP-2007-6105, NASA Systems Engineering Handbook, 273 describes tools and techniques for analyzing and managing risks, including: Plan to address software risks After the team identifies and analyzes the initial set of risks, a plan for managing those risks (and any risks identified later in the project life cycle) is needed. This plan may be standalone or be captured in the Software Development Plan/Software Management Plan (SDP/SMP) and updated throughout the project life cycle to reflect current risk management status. It is also important to inform providers, typically via their contract, that their risk management plans will be reviewed periodically by the acquirer. Typical options for addressing risks include: The risk management plan needs to include topics such as: The team needs to consider costs associated with managing, controlling, and mitigating risks when developing the risk management plan. This can be especially important for projects with limited or constrained budgets. Project-level risk management plans need to describe coordination with program-level plans to ensure proper risk tracking and information sharing. Once the plan is created, it is reviewed and approved by an appropriate level of project management before it is implemented. Track software risks Risks that are not eliminated need to be tracked throughout the project life cycle to ensure their mitigation strategies remain effective. For low-risk items that are not formally included in the risk management plan, consider using a watch list so that they are not forgotten and to help ensure that they do not escalate to a higher level risk later in the project. Additionally, conditions that the team has identified as risk triggers are also monitored and tracked until those situations are no longer risk factors. Risk status also needs to be tracked and weighed against risk criteria to determine if corrective action needs to be taken. If a risk management tool is in use for the project, risks need to be added to and tracked using this tool. A tracking tool could be a simple spreadsheet or database for a small project, a tool purchased specifically for tracking risks, or part of an integrated tool used to track multiple aspects of the project. Control software risks When a risk occurs, action needs to be taken. Those actions should have been included in the risk management plan and need to be implemented in this step. Their effectiveness also needs to be measured so adjustments to the plan can be made, if necessary. Communicate software risk information Risk information is communicated to all relevant stakeholders throughout the project life cycle. Stakeholders include project managers, project technical personnel, test team members, and anyone else affected by or with the need to know about risks, their impact, and their mitigations. Project life cycle reviews are one mechanism for risk communication. Information, such as the effectiveness of risk mitigations and action plans, needs to be communicated to project managers, technical authorities, and other roles that make risk decisions and risk-based decisions throughout the project life cycle. Document software risks Documenting software risks is an activity that the team needs to do as part of all previous steps. Documentation could include: NASA-STD-8719.13, NASA Software Safety Standard, 271 requires that "The software safety manager shall assure that risks affecting software safety are captured, addressed, and managed as part of program, project, and facility risk management processes, and those risks which could impose a system hazard are captured in the system hazard analyses." The table below shows roles and responsibilities typical for continuous risk management: Role Responsibilities Center SMA (Safety and Mission Assurance) organizations Provide risk management consultation, facilitation, and training to program/project organizations. 009 Software management Review and approve risk management plan; ensure continuous risk management is implemented; designate the risk manager; ensure that key decisions are risk-informed; coordinate management of risks across affected projects or project elements. Software Risk Manager Overall responsibility for software risk management; ensures risk management plan developed. 009 Project software team members Bring risks to management's attention; support Risk Manager in monitoring and controlling risks. A recommended practice is that the Software Lead Engineer maintain a list of software risks independent of the program's risk list. Frequently, the program risks are larger than any given software risk item. The software risk data needs to be maintained in an organizational database. Additional guidance related to risk management may be found in the following related requirement in this Handbook: Software Development/Management Plan Projects with limited budgets may consider using spreadsheets or small databases to track their project risks rather than purchase a tool for this purpose. Small projects could also consider using tools available at the Center level since those may have no associated purchase or lease costs. Tools to aid in compliance with this SWE, if any, may be found in the Tools Library in the NASA Engineering Network (NEN). NASA users find this in the Tools Library in the Software Processes Across NASA (SPAN) site of the Software Engineering Community in NEN. The list is informational only and does not represent an “approved tool list”, nor does it represent an endorsement of any particular tool. The purpose is to provide examples of tools being used across the Agency and to help projects and centers decide what tools to consider. The NASA Lessons Learned database contains the following lessons learned related to risk management:
See edit history of this section
Post feedback on this section
1. Requirements
1.1 Notes
1.2 Applicability Across Classes
X - Applicable with details, read above for more | P(C) - P(Center), follow center requirements or procedures2. Rationale
3. Guidance
Software assurance and safety personnel
Participate in CCB (Configuration Control Boards) to help identify risks; assure safety risks are captured and managed by programs, projects, facilities.
Note: could be the Software Lead Engineer and is not necessarily a full-time role.4. Small Projects
5. Resources
5.1 Tools
6. Lessons Learned
SWE-086 - Continuous Risk Management