1. Introduction
1
2. Metrics Table
2
3. Resources
Div
id
tabs-1
1. Introduction
Excerpt
This topic contains the complete list of software assurance/safety metrics that are suggested for use with the SA tasks in NASA-STD-8739.8.
These suggested metrics will provide SA and safety personnel with much of the information they will need to assess both the software assurance/safety work, as well as providing information to help with the monitoring of the software engineering progress.
The next Metrics Table tab shows the set of metrics in a table and provides a way to download an Excel file. The Excel file contains the same metrics but has the capability of being able to filter the columns. This provides an easy way to see which metrics are associated with a particular SWE, and to filter out SWEs that may be tailored out in your project. These tables provide information on potential phases in which each metric might be collected. Be sure to read the information at the top of each metrics sheet for more specific information on the use of the tables.
Each project should review the table and decide which metrics they want to collect, based on the metrics that they think will provide them with the most information for their activities.
Div
id
tabs-2
2. Metrics Table
The table below provides suggested metrics for the SWE requirements in Sections 7.3 of the SA tabs in the SWEs of this Handbook.
There are multiple “Metrics Types”, and each type includes optional “Measurements” by life-cycle phase for the “Associated SWE Requirements”. Many of the measurements were reworded to clarify them or to make them more generic so they could be applied in multiple places. For example, the word “non-conformance” was used in lieu of findings, problem reports, defects, or errors to cover all types of non-conformances. When choosing a measurement, change the word “non-conformance” to the one that best fits the situation to be monitored. (Note: these may be collected by the project and analyzed by SA.) Projects should choose a set of measurements to provide information on the project being implemented. The measurements do not have to be implemented as written. They may be modified to best fit the characteristics of the project.
The life-cycle phases listed below indicate the recommended phase the data may be collected (color has been added only to provide a visual reference as you scroll down the page). However, it does not mean it has to be collected in each phase. Establish a set of measurements that best suits the project taking into consideration the size and applicability of the activity. For example, if a configuration audit metric is collected, it may be appropriate to collect those measurements during most of the life-cycle phases listed, but the project may not be doing configuration audits in all the listed phases.
The NPR 7150.2C SWE requirement numbers listed in the table below are associated with the SA tasking in NASA-STD-8739.8 but may not be the only applicable SWE requirement for a particular metric.
There are a few measurements that are required specifically for analysis in NASA-STD-8739.8. They are listed in bold type. Other measurements listed in the charts should be considered when performing the tasking activities associated with the SWE numbers for the metric.
Note
In some cases, in order to understand the full context of the metric listed in a requirement, look at the metrics in 8.18 to see other measures that contribute to the metric in a particular requirement. For example, the table shows SWE-036 with the metric, “# of software components (e.g. programs, modules, routines, functions, etc.) planned versus the number actually released in each build.” SWE-036, task 1c would provide the planning information for the scheduled deliverables. However, in order to complete the metric in SWE-036, it would be necessary to use the information collected in SWE-077 to get the “# of components actually released in each build.”
For a usable MS Excel version of this table, click on the image below and download the file.
A Word version of the full table is reproduced below if you don't want to download the Excel version.
Metrics Type
Measurements
Plan
Reqt
Des
Imp
Test
Del
Associated SWE Reqt #
Peer Review Metrics
· # of peer reviews performed vs. # of peer reviews planned
X
X
X
X
X
SWE-016
SWE-087
SWE-089
· # of Non-Conformances identified in each peer review
X
X
X
X
X
SWE-087
SWE-089
· # of Non-Conformances identified by software assurance during each peer review
X
X
X
X
X
SWE-087
SWE-088
SWE-089
· Total # of peer review Non-Conformances (Open, Closed)
X
X
X
X
X
SWE-087
SWE-088
SWE-089
· Preparation time each review participant spent preparing for the review
X
X
X
X
X
SWE-088
SWE-089
· Time required to close review Non-Conformances
X
X
X
X
X
SWE-087
SWE-088
SWE-089
· # of peer review participants vs. total # invited
X
X
X
X
X
SWE-088
SWE-089
· # of peer review Non-Conformances per work product vs. # of peer reviewers
X
X
X
X
X
SWE-088
SWE-089
Peer Review Audit Metrics
· # of audit Non-Conformances per peer review audit
X
X
X
X
X
SWE-088
· # of Peer Review Audits planned vs. # of Peer Review Audits performed
X
X
X
X
X
SWE-016
SWE-087
SWE-088
· Trends on non-conformances from audits (Open, Closed, Life-cycle Phase)
X
X
X
X
X
SWE-088
SWE-089
· Time required to close peer review audit Non-Conformances
X
X
X
X
X
SWE-088
SWE-089
· Preparation time each audit participant spent preparing for audit
X
X
X
X
X
SWE-088
SWE-089
Problem/Change Report Status Metrics
· Total # of Non-Conformances over time (Open, Closed, # of days Open, and Severity of Open)
· # of Non-Conformances in current reporting period (Open, Closed, Severity)
X
X
X
X
X
X
SWE-062
SWE-065c
SWE-065d
SWE-068
SWE-202
SWE-203
SWE-204
· # of safety-related Non-Conformances
X
X
X
X
X
SWE-203
SWE-068
SWE-071
· Trend of Open vs. Closed Non-Conformances over time
X
X
X
X
X
X
SWE-053
SWE-054
SWE-202
SWE-065
· Trend of change status over time (# of changes approved, # in implementation, # in test, # closed)
X
X
X
X
X
X
SWE-018
SWE-053
SWE-080
· # of Non-Conformances identified in embedded COTS, GOT, MOTS, OSS, or reused components in ground or flight software vs. # of Non-Conformances successfully closed
X
X
X
SWE-136
SWE-202
SWE-203
SWE-211
· # of Non-Conformances identified in source code products used (Open, Closed)
X
X
X
SWE-202
SWE-203
· # of software Non-Conformances at each Severity level for each software configuration item (Open, Closed)
Note: Metrics in bold type are required by all projects.
X
X
X
SWE-202
· # of Closed action items vs. # of Open action items
X
X
X
X
X
X
SWE-062
SWE-065c
· # of Root Cause Analyses performed;
· # of Non-Conformances identified by each root cause analysis
X
X
X
X
SWE-204
SA Corrective Action (CA) metrics (Issues, Risks)
· # of CAs raised by SA vs. total #
· Attributes (Type, Severity, # of days Open, Life-cycle Phase Found)
· State (Open, In work, Closed)
· Trends of CA closures over time
X
X
X
X
X
X
SWE-024
SWE-204
SWE-054
· Trend the # of inconsistencies or corrective actions identified, and # closed.
X
X
X
X
X
SWE-054
SWE-024
SWE-204
. # of open vs. closed issues over time and latency
X
X
X
X
X
X
SWE-018
Process Improvement Metrics
· # of software work product Non-Conformances identified by life-cycle phase over time
X
X
X
X
X
X
SWE-013
SWE-022
SWE-024
SWE-039
SWE-051
SWE-054
SWE-057
SWE-058
SWE-062
SWE-065b
SWE-065c
SWE-068
SWE-071
SWE-075
SWE-079
SWE-084
SWE-086
SWE-087
SWE-125
SWE-134
SWE-139
SWE-146
SWE-157
SWE-158
SWE-159
SWE-184
SWE-185
SWE-187
SWE-191
SWE-194
SWE-201
SWE-204
SWE-205
· # of software process Non-Conformances by life-cycle phase over time
X
X
X
X
X
X
SWE-032
SWE-039
SWE-061
SWE-077
SWE-080
SWE-082
SWE-085
SWE-086
SWE-088
SWE-139
SWE-195
SWE-204
Characteristics Metrics
· Identify the specific requirements in NASA-STD-8739.8 that are being tailored by the projects (*organizational metric)
X
X
X
X
X
X
SWE-121
SWE-125
SWE-013
SWE-176
· # of projects tailoring each requirement (*organizational measure)
· % of requirements tailored per project (*organizational measure)
X
X
X
X
SASS-01
SASS-09
SWE-125
SWE-013
SWE-121
· % of Total Source Code for each Software Classification (*organizational measure)
X
X
X
SWE-020
SWE-176
SWE-087
Cost/ Effort Metrics
· Planned SA resource allocation vs. actual SA resource allocation
X
X
X
X
X
X
SWE-015
SWE-174
SWE-151
· Comparison of initial SA cost estimates vs. final cost (capturing assumptions and differences)
X
X
SWE-174
SWE-015
SWE-151
· Trend SA cost estimates throughout life-cycle
X
X
X
X
X
X
SWE-174
Training Metrics
· % of required training completed for each of the project SA personnel
X
X
X
X
SWE-017
· % of project personnel that have completed project specific training against planned training
X
X
X
X
X
SWE-017
Compliance Audit Metrics
· # of Compliance Audits planned vs. # of Compliance Audits performed
X
X
X
X
X
X
SWE-024
SWE-039
SWE-139
SWE-016
SWE-032
SWE-077
SWE-195
SWE-082
SWE-084
SWE-085
SWE-086
SWE-088
SWE-079
· # of Open vs. Closed Audit Non-Conformances over time
· Trends of # of Non-Conformances from audits over time (Include counts from process and standards audits and work product audits.)
X
X
X
X
X
X
SWE-024
SWE-039
SWE-139
SWE-016
SWE-032
SWE-077
SWE-079
SWE-195
SWE-082
SWE-084
SWE-085
SWE-086
SWE-088
SWE-201
· # of Non-Conformances identified in plans (e.g., SMPs, SDPs, CM Plans, SA Plans, Safety Plans, Test Plans)
X
X
X
X
X
SWE-024
SWE-013
SWE-075
SWE-079
SWE-139
SWE-071
· # of Non-Conformances identified in the software Configuration Management Plan
· Trends of # Open vs. # Closed over time
X
X
X
X
X
SWE-079
· # of Configuration Management Audits conducted by the project – Planned vs. Actual
X
X
X
X
X
SWE-082
SWE-077
SWE-084
· # of Non-Conformances per audit (including findings from process and compliance audits, process maturity)
X
X
X
X
X
X
SWE-024
SWE-039
SWE-139
SWE-016
SWE-032
SWE-077
SWE-195
SWE-082
SWE-084
SWE-085
SWE-086
SWE-088
SWE-079
· # of process Non-Conformances (e.g., activities not performed) identified by SA vs. # accepted by the project
· Trends of # Open vs. # Closed over time
X
X
X
X
X
X
SWE-016
SWE-039
SWE-032
SWE-077
SWE-195
SWE-082
SWE-084
SWE-085
SWE-086
SWE-088
Project Acceptance Metrics
· # of Non-Conformances (activities not being performed)
· # of Non-Conformances accepted by project
· # of Non-Conformances (Open, Closed, Total)
· Trends of over time
X
X
X
X
X
X
SWE-087
SWE-201
SWE-039
SWE-139
Progress Tracking Metrics
· Deviations of actual schedule progress vs. planned schedule progress above defined threshold
· # of Software Requirements that do not trace to a parent requirement
X
X
X
SWE-033
SWE-050
SWE-051
· # of architectural issues identified vs. number closed
X
SWE-057
SWE-058
SWE-143
. # of planned units for implementation vs. # of units tested and implemented
X
SWE-060
· # of planned unit test cases vs. # of actual unit test cases successfully completed
X
SWE-062
SWE-186
· # of software requirements with completed test procedures over time
X
X
SWE-065b
SWE-052
SWE-066
SWE-071
SWE-191
· Total # of tests completed vs. number of test results evaluated and signed off
X
X
SWE-066
SWE-068
SWE-065c
SWE-159
· # of Safety Critical tests executed vs. # of Safety Critical tests witnessed by SA
X
X
X
SWE-066
SWE-068
SWE-065c
SWE-159
SWE-062
SWE-186
· # of software components (e.g. programs, modules, routines, functions, etc.) planned vs. # actually released in each build
X
X
SWE-194
SWE-077
SWE-073
SWE-036
· # of Non-Conformances from reviews (Open vs. Closed; # of days Open)
X
X
X
X
X
X
SWE-134
SWE-037
SWE-039
SWE-087
SWE-088
SWE-089
SWE-143
· # of Software Requirements being met via satisfactory testing vs. total # of Software Requirements
X
X
X
SWE-066
SWE-065b
SWE-066
SWE-192
SWE-071
· # of Software Requirements without associated test cases
X
X
X
SWE-066
SWE-065b
SWE-071
Risk Management Metrics
· # of Risks identified in each life-cycle phase (Open, Closed)
X
X
X
X
X
X
SWE-086
SWE-039
SWE-179
SWE-154
SWE-156
SWE-190
· # of Risks by Severity (e.g., red, yellow, green) over time
X
X
X
X
X
X
SWE-032
SWE-033
SWE-039
SWE-086
SWE-154
SWE-156
SWE-179
SWE-190
SWE-191
· # of Risks with mitigation plans vs. total # of Risks
X
X
X
X
X
X
SWE-032
SWE-033
SWE-039
SWE-086
SWE-154
SWE-156
SWE-179
SWE-190
SWE-191
· # of Risks trending up over time
· # of Risks trending down over time
X
X
X
X
X
X
SWE-032
SWE-033
SWE-039
SWE-086
SWE-154
SWE-156
SWE-179
SWE-190
SWE-191
Cybersecurity Risks Metrics
· # of Cybersecurity Risks identified (Open, Closed, Severity)
X
X
X
X
SWE-154
SWE-156
SWE-151
· # of Cybersecurity Risks with Mitigations vs. # of Cybersecurity Risks identified
X
X
X
X
SWE-154
SWE-156
SWE-151
SWE-159
Traceability Metrics
· % of traceability completed in each area: System Level requirements to Software requirements; Software Requirements to Design; Design to Code; Software Requirements to Test Procedures
X
X
X
X
SWE-052
· % of traceability completed for all hazards to software requirements and test procedures
X
X
X
X
SWE-052
· Defect trends for trace quality (# of circular traces, orphans, widows, etc.)
X
SWE-051
SWE-052
Requirements Metrics
· # of detailed software requirements vs. # of estimated SLOC to be developed by the project
X
X
X
SWE-050
SWE-051
SWE-151
SWE-174
· # of incorrect, missing and incomplete requirements (i.e., # of requirements issues) vs. # of requirements issues resolved
X
X
SWE-051
SWE-053
SWE-054
· Software Requirements Volatility (# of requirements added, deleted, modified, # of TBDs over time)
X
X
X
X
SWE-200
SWE-053
· # of TBD/TBC/TBR requirements trended over time
X
X
X
X
SWE-066
Safety Metrics
· # of safety-related requirement issues (Open, Closed) over time
X
X
X
X
X
SWE-039
SWE-139
SWE-205
SWE-023
SWE-134
SWE-184
SWE-052
SWE-051
SWE-058
SWE-065b
SWE-066
SWE-071
SWE-192
SWE-080
SWE-087
· # of safety-related non-conformances identified by life-cycle phase (over time, Open vs. Closed, # of days)
X
X
X
X
X
SWE-013
SWE-039
SWE-139
SWE-143
SWE-121
SWE-184
SWE-023
SWE-134
SWE-052
SWE-051
SWE-057
SWE-058
SWE-135
SWE-062
SWE-065a
SWE-065b
SWE-066
SWE-068
SWE-071
SWE-191
SWE-080
SWE-081
SWE-087
SWE-205
Reuse Metrics
· # of products submitted for reuse;
· # of developed products submitted for reuse vs. total # of developed products
X
SWE-147
SWE-148
· # of developed products entered in NASA Internal Sharing & Reuse System vs. total # of developed products
X
SWE-147
SWE-148
· # of products submitted for reuse vs. # of products entered into NASA Internal Sharing & Reuse Systems
X
SWE-147
SWE-148
Cybersecurity Metrics
· # of Cybersecurity vulnerabilities and weaknesses identified
· # of Cybersecurity vulnerabilities and weaknesses (Open, Closed, Severity)
· Trending of Open vs. Closed over time
X
X
X
X
X
X
SWE-158
SWE-155
SWE-159
SWE-135
SWE-063
· # and type of vulnerabilities and weaknesses identified by the project
X
X
X
X
X
SWE-158
SWE-135
SWE-063
· # of Cybersecurity vulnerabilities and weaknesses identified by life-cycle phase
X
X
X
X
X
SWE-158
SWE-159
SWE-135
SWE-063
· # of Cybersecurity vulnerabilities and weaknesses identified vs. # resolved during Implementation
X
X
X
SWE-155
SWE-158
SWE-159
SWE-135
SWE-063
· # of Non-Conformances identified in Cybersecurity coding standard compliance (Open, Closed)
X
X
X
SWE-063
SWE-135
SWE-155
SWE-158
SWE-207
Static Code Metrics
· Document the Static Code Analysis tools used with associated Non-Conformances
· # of total errors and warnings identified by tool
· # of errors and warnings evaluated vs. # of total errors and warnings identified by tool
X
SWE-135
SWE-158
SWE-185
· # of Non-Conformances raised by SA vs. total # of raised Non-Conformances
X
SWE-135
SWE-158
SWE-185
· # of static code errors and warnings identified as “positives” vs. # of total errors and warnings identified by tool
· # of static code errors and warnings resolved by Severity vs. # of static code errors and warnings identified by Severity by tool
X
SWE-135
SWE-158
SWE-185
· # of static code “positives” over time (Open, Closed, Severity)
X
X
SWE-135
SWE-185
· # of Cybersecurity vulnerabilities and weaknesses identified by tool
X
X
SWE-135
SWE-158
SWE-185
· # coding standard violations identified (Open, Closed, type of violation, Severity)
X
SWE-061
SWE-185
· Software cyclomatic complexity # for safety critical components
X
X
SWE-087
SWE-134
· Trend of # of total errors and warnings identified per SCA Tool, Language, and SLOC size
X
SWE-135
SWE-158
Test Procedures Metrics
· # of Non-Conformances and risks open vs. # of Non-Conformances, risks identified with test procedures
X
X
SWE-087
SWE-065b
SWE-071
SWE-191
· # of hazards with completed test procedures/cases vs. total number of hazards over time
X
X
SWE-065b
SWE-068
SWE-191
· # of software requirements with completed test procedures/cases over time
X
X
SWE-065b
SWE-071
SWE-066
· # of Non-Conformances identified when the approved, updated requirements are not reflected in test procedures
X
X
SWE-065b
SWE-071
SWE-191
· # of Non-Conformances identified while confirming hazard controls are verified through test plans/procedures/cases
X
X
SWE-065b
SWE-071
SWE-066
SWE-068
SWE-191
Test Metrics
· # of tests executed vs. # of tests successfully completed
X
X
X
SWE-062
SWE-066
SWE-065c
SWE-068
SWE-159
SWE-190
SWE-192
SWE-055
SWE-080
SWE-191
SWE-194
SWE-211
· # of Non-Conformances identified during each testing phase (Open, Closed, Severity)
X
X
X
SWE-062
SWE-065c
SWE-066
SWE-068
SWE-080
SWE-159
SWE-190
SWE-191
SWE-192
SWE-194
SWE-211
· # of Requirements tested successfully vs. total # of Requirements
X
X
X
SWE-062
SWE-065b
SWE-065c
SWE-066
SWE-080
SWE-191
SWE-192
SWE-194
· # of Hazards containing software that have been successfully tested vs. total # of Hazards containing software
X
X
X
SWE-062
SWE-066
SWE-068
SWE-080
SWE-134
SWE-192
SWE-205
· # of Non-Conformances identified in models, simulations, and tools over time (Open, Closed, Severity)
X
X
X
SWE-070
· # of Regression test set Non-Conformances/Risks over time (Open, Closed, Severity)
X
X
X
SWE-191
· # of Requirements successfully tested in customer environment vs. # of Requirements
X
X
SWE-055
Cybersecurity Metrics During Testing Metrics
· # of Cybersecurity mitigation implementations identified from the security vulnerabilities and security weaknesses
X
X
X
SWE-154
SWE-155
SWE-159
SWE-191
· # of Cybersecurity mitigation implementations identified with associated test procedures vs. # of Cybersecurity mitigation implementations identified
X
X
X
SWE-154
SWE-155
SWE-159
SWE-191
· # of Cybersecurity mitigation tests completed vs. total # of Cybersecurity mitigation tests
X
X
X
SWE-159
· # of Non-Conformances identified during Cybersecurity mitigation testing (Open, Closed, Severity)
X
X
X
SWE-159
· Trends of Cybersecurity Non-Conformances over time
X
X
X
SWE-158
SWE-159
SWE-155
SWE-063
SWE-135
SWE-201
Test Coverage Metrics
· Software code/test coverage percentages for all identified safety-critical components (e.g., # of paths tested vs. total # of possible paths)
X
X
X
SWE-066
SWE-190
SWE-134
SWE-189
· # of tests successfully completed vs. total # of tests
X
X
X
SWE-055
SWE-062
SWE-066
SWE-065c
SWE-068
SWE-080
SWE-159
SWE-190
SWE-191
SWE-192
SWE-194
SWE-211
· # of detailed software requirements tested to date vs. total # of detailed software requirements
X
X
X
SWE-055
SWE-062
SWE-065b
SWE-065c
SWE-066
SWE-071
SWE-080
SWE-191
SWE-192
SWE-194
SWE-159
· # of safety critical requirement verifications vs. total # of safety critical requirement verifications completed
· # of Open issues vs. # of Closed over time
X
X
X
SWE-062
SWE-066
SWE-191
SWE-192
SWE-068
· # of Source Lines of Code (SLOC) tested vs. total # of SLOC
X
X
X
SWE-066
SWE-134
SWE-189
SWE-190
Build/Release Content Metrics
· # of software units planned vs. # actually built
X
X
X
X
SWE-063
SWE-194
· # of planned software requirements implemented in each build vs. # of actual software requirements implemented in each build
X
X
X
SWE-063
SWE-194
· # of Non-Conformances identified in release documentation (Open, Closed)
X
X
X
SWE-063
SWE-077
SWE-084
SWE-085
Operations/ Maintenance Metrics
· # of Non-Conformances identified in the software after delivery
X
SWE-195
IV&V Metrics (Kept by IV&V)
· Metrics on IV&V Non-Conformances (# of issues, risks, open, closed, severity, category (requirements, code, test, documentation, etc.))
· Kept by IV&V team, not SA
X
X
X
X
X
X
SWE-179
SASS-02
Div
id
tabs-3
3. Resources
3.1 References
refstable-topic
Show If
group
confluence-users
Panel
titleColor
red
title
Visible to editors only
Enter necessary modifications to be made in the table below:
SWEREFs to be added
SWEREFS to be deleted
SWEREF-083
SWEREF-278
SWEREFs NOT called out in text but listed as germane: none