bannerd

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

RevSWE Statement
A

4.4.3 The project shall specify and record data collection and storage procedures for their selected software measures and collect and store measures accordingly.

Difference between A and BRe-write of software measures requirement to not just collect and store but to utilize the data.
B

2.1.3.10 For Class A, B, C, and safety-critical software projects, the Center Director shall utilize software measurement data for monitoring software engineering capability, improving software quality, and tracking the status of software engineering improvement activities.

Difference between B and CRemoved "safety-critical" from the requirement.
C

Excerpt Include
SWEHBVC:SWE-092 - Using Measurement Data
SWEHBVC:SWE-092 - Using Measurement Data
nopaneltrue

Difference between C and DNo Change
D

Excerpt Include
SWEHBVD:SWE-092 - Using Measurement Data
SWEHBVD:SWE-092 - Using Measurement Data
nopaneltrue

...