Page History
...
Rev | SWE Statement | ||||||||
---|---|---|---|---|---|---|---|---|---|
A | 3.1.1.3 The project shall perform software requirements analysis based on flowed - down and derived requirements from the top-level systems engineering requirements and the hardware specifications and design. | ||||||||
Difference between A and B | No change | ||||||||
B | 4.1.2.2 The project manager shall perform software requirements analysis based on flowed - down and derived requirements from the top-level systems engineering requirements and the hardware specifications and design. | ||||||||
Difference between B and C | Added requirement to perform software requirements analysis based on safety and reliability analyses. | ||||||||
C |
| ||||||||
Difference between C and D | No change | ||||||||
D |
|
...