Typically starts with a quote from the NPR that helps define the activity. Additional descriptive material is meant to help define the activity but not be so detailed that it pulls in all of the guidance from the SWEs in the activity.
Panel
borderColor
blue
title
NPR 7150.2B para 4.3.1
Include Page
2D-Para 4.3.1
2D-Para 4.3.1
Software peer reviews and inspections are the in-process technical examination of work products by peers to find and eliminate defects early in the life cycle. Software peer reviews and inspections are performed following defined procedures covering the preparation for the review, the review itself is conducted, results are recorded, results are reported, and completion criteria is certified. When planning the composition of a software peer review or inspection team, consider including software testing, system testing, software assurance, software safety, software cybersecurity, and software IV&V personnel.
Panel
borderColor
black
borderWidth
2
title
Inputs, Outputs, and Predecessor Activities
Activity graphical representation of Inputs, Outputs, Predecessor and Successor Activities as appropriate. Not meant to be exhaustive, but representative of a typical project.
Diagram here →
1.1 Inputs
Note
List of some of the inputs from other activities that are necessary for the activity to begin.
Examples:
bullet list of input documents (links to doc contents pages if applicable)
1.2 Predecessor Activities
Note
List of some of the other activities that must be started (not necessarily completed) so that this activity may begin.
Examples:
bullet list of links to other activities
1.3 Outputs
Note
List of some of the outputs or work products of the activity. These are typically used as inputs by the downstream activity. In some cases there is a supporting SWE associated with the work product.
Output Work Product
Used by Downstream Activity
1.4 Successor Activities
Note
Links to Activities which might be started or supported by this activity.
Examples:
bullet list of activities (links)
Reviews
1.5 Activity Repetition
Note
Describe what conditions determine if the activity needs to be repeated, such as re-planning after a change in requirements or schedule constraints.
How much of the activity needs to be repeated
Frequency of repetition
ACTIVITY is always done once. Ideally it will be peer reviewed and analyzed by Software Assurance.
ACTIVITY may be reviewed and re-analyzed as often as there are significant changes in architecture or requirements. For example,
Technology changes to the architecture requires changes to the ACTIVITY
Customer changes to requirements require changes to the ACTIVITY
1.6 Center Resources From SPAN
Note
Add Leave links to SPAN activity pages that are appropriate for this activity. Use links Links from the Activity section of the front page of SPAN. All of the links to SPAN activities are provided. SPANDelete the ones that do not apply.
Several Centers Process Asset Libraries have materials related to this activity. Related Processes, templates, and other resources may be found in the following Activities in SPAN (available to NASA only).
This section is for SWEHB pages, other than SWEs, that directly support the activity. This section contains Topics, document content pages, PATs, and other pages.
TITLE/LINK
EXCERPT
2.2.1 Topics
Expand
title
SWE-999 Topics
Include Page
SWE-999-ETopics
SWE-999-ETopics
(Topics)
2.2.2 Supporting Materials
Expand
title
SWE-058 Supporting Materials
Include Page
SWE-999-ESupport
SWE-999-ESupport
(if any, Engineering Support materials)
2.3 Other Associated SWEs, Topics, etc.
Note
Includes other SWEHB pages that are indirectly associated with the activity. May include SWEs, Topics, document definition pages, PATs, etc. They may have been mentioned in the guidance of another page. this This section may be removed if there is no content for it.
Div
id
tabs-3
3. Software Assurance Activity
Software Assurance is integral to the performance of all Software Development activities. It includes Process Monitoring as well as Process Analysis.
Process Monitoring - addresses the question, "Is the development team following their processes and producing the expected work products?"
Process Analysis - addresses the question, "Are there better ways of performing the processes that would result in the early discovery of defects?"
3.1 Software Assurance Tasks from SWEs
Software Assurance Tasks are included in tab 7 of the SWEs in this activity.
3.1.1 - TITLE/LINK
SWE-999 Title
Expand
title
SWE-058 SA Tasking and Work Product Details
Link to SWE-999 - Title as link to SWE
Requirement
Excerpt Include
SWE-999 - Title
SWE-999 - Title
nopanel
true
Tasking From NASA-STD-8739.8B
Software Assurance Products
Metrics
Include Page
SWE-058 - SA Task1
SWE-058 - SA Task1
SA Work Products
Include Page
SWE-999-SAWP
SWE-999-SAWP
3.2 Topics and Other Supporting Materials
3.2.1 Topics
TITLE/LINK for each Topics
EXCERPT
Other details from Topic as appropriate - Tasking
3.2.2 Process Asset Templates
TITLE/LINK for PAT table category
Include Page of the category
3.3 Other Associated SWEs, Topics, etc.
Note
Includes other SWEHB pages that are indirectly associated with the activity. May include SWEs, Topics, document definition pages, PATs, etc. They may have been mentioned in the guidance of another page. this This section may be removed if there is no content for it.