4. Schedules

3.3 Software Schedules

SWE-016 - Software Schedule
SWE-018 - Software Activities Review
SWE-046 - Supplier Software Schedule

Tabsetup
01. Introduction
12. Initiation and PlanningDefining the Activity
23. Estination
34. Schedules
45. Training
56. Classification
6Assurance and Safety
7Coding
89. Cybersecurity
910. Scope
Software Assurance

2. Initiation and Planning

3.1 Software Life Cycle Planning

SWE-033 - Acquisition vs. Development
                   Assessment
 
SWE-013 - Software Plans

SWE-024 - Plan Tracking 
SWE-034 - Acceptance Criteria
SWE-036 - Software Process Determination
SWE-037 - Software Milestones
SWE-039 - Software Supplier Insight
SWE-040 - Access to Software Products
SWE-042 - Source Code Electronic Access
SWE-139 - Shall Statements
SWE-121 - Document Tailored Requirements
SWE-125 - Requirements Compliance Matrix
SWE-027 - Use of Commercial, Government,
                   and Legacy Software

Div
idtabs-1

1. Introduction

Initiation and Planning activities occur at the beginning of a project.

A project may be for the creation of a new product, or the enhancement of an existing product. It may even involve the merging of capabilities from multiple products into a new, more capable product. It is always necessary to have an understanding of what the outcome of the project is. This is often called the High Level Requirements. These requirements set direction for the project.  Once the direction is set, an early activity is the Make, Buy or Reuse decision. 

Div
idtabs-2
Div
idtabs-3

3. Estimation

3.2 Software Cost Estimation

SWE-015 - Cost Estimation
SWE-151 - Cost Estimate Conditions
SWE-174 - Software Planning Parameters

Div
idtabs-4

Note

Typically starts with a quote from the NPR that helps define the activity. Additional descriptive material is meant to help define the activity but not be so detailed that it pulls in all of the guidance from the SWEs in the activity. 

Panel
borderColorblue
titleNPR 7150.2B para 5.3.1

Software peer reviews and inspections are the in-process technical examination of work products by peers to find and eliminate defects early in the life cycle. Software peer reviews and inspections are performed following defined procedures covering the preparation for the review, the review itself is conducted, results are recorded, results are reported, and completion criteria is certified. When planning the composition of a software peer review or inspection team, consider including software testing, system testing, software assurance, software safety, software cybersecurity, and software IV&V personnel.

Panel
borderColorblack
borderWidth2
titleInputs, Outputs, and Predecessor Activities

Activity graphical representation of Inputs, Outputs, Predecessor and Successor Activities as appropriate. Not meant to be exhaustive, but representative of a typical project. 

 

1.1 Inputs

Note

List of some of the inputs from other activities that are necessary for the activity to begin. 

Examples: 

  • Planning - Peer Reviews are planned activities. They appear in the plans and schedules for the project
  • Requirements - These are the things that are Peer Reviewed
  • Architecture Items - These are the things that are Peer Reviewed
  • Design items - These are the things that are Peer Reviewed
  • Test Plans and Procedures - These are the things that are Peer Reviewed

1.2 Predecessor Activities

Note

List of some of the other activities that must be started (not necessarily completed) so that this activity may begin. 

Examples: 

Predecessor Activities are performed before Peer Reviews. These activities produce the work products that will be reviewed. 

  • Life Cycle Planning - plans, schedules, estimates, etc.
  • Software Architecture 
  • Software Design
  • Software Testing - plans and procedures

1.3 Outputs

Note

List of some of the outputs or work products of the activity. These are typically used as inputs by the downstream activity. In some cases there is a supporting SWE associated with the work product. 

Examples: 


The activities that initiated the Peer Review, receive the findings from Peer Reviews, Those activities then use those findings to to fix defects and implement improvements uncovered in the reviews. 

Output Work ProductUsed by Downstream Activity
  • Peer Review Findings
  • Life Cycle Planning
  • Software Architecture 
  • Software Design
  • Software Testing
  • Configuration Management
  • Coding


1.4 Successor Activities

Note

Links to Activities which might be started or supported by this activity. 


1.5 Activity Repetition

Note

Describe what conditions determine if the activity needs to be repeated, such as re-planning after a change in requirements or schedule constraints. 

  • How much of the activity needs to be repeated
  • Frequency of repetition


1.6 Center Resources From SPAN

Note

Add links to SPAN activity pages that are appropriate for this activity. Use links from the Activity section of the front page. SPAN

Several Centers Process Asset Libraries have materials related to this activity. Related Processes, templates, and other resources may be found in the following Activities in SPAN (available to NASA only). 


Div
idtabs-2

2. Defining the Activity

Note

This tab contains the links to pages in the SWEHB that are at the heart of the activity. 

2.1 SWEs

Note

This section contains the links to SWE pages that form the heart of the activity. 

  • Link to the SWE goes here
    • Excerpt include for the SWE goes here (Remove Surrounding Panel)

2.2 Topics and other Supporting Materials

Note

This section is for SWEHB pages, other than SWEs, that directly support the activity. This section contains Topics, document content pages, PATs, and other pages. 

  • Link to the Topic or page goes here
    • Excerpt include for the Topic or page goes here (Remove Surrounding Panel)

2.3 Other Associated SWEs, Topics, etc.

Note

Includes other SWEHB pages that are indirectly associated with the activity. May include SWEs, Topics, document definition pages, PATs, etc. They may have been mentioned in the guidance of another page. 

  • Include page for the PAT page goes here


Div
idtabs-3

3. Software Assurance

Software Assurance is integral to the performance of all Software Development activities. It includes Process Monitoring as well as Process Analysis. 

  • Process Monitoring - addresses the question, "Is the development team following their processes and producing the expected work products?"
  • Process Analysis - addresses the question, "Are there better ways of performing the processes that would result in the early discovery of defects?"

3.1 Software Assurance Tasks

Software Assurance Tasks are included in many of the SWEs in this activity. 

Note

For each of the SWEs in this activity (see tab 2 .1 SWEs) populate the table below with the SWE, Requirement, and SA Tasks.

  • The first column is for the SWE number
  • The second column is for the requirement - using the Excerpt Include macro to pull in the Excerpt from the SWE page (excerpt includes the text of the requirement)
  • The third column is for the SA Tasks using the Include Page macro - Each of the SA Tasks for a SWE are child pages under SITE:NASA-STD-8739.8B page 

SWE-034 is used below only as an example of how to populate the table. The example below, using SWE-034, should be replaced by the actual SWEs in this activity. 

SWERequirementSA Tasks

034

Excerpt Include
SWEHBVD:SWE-034 - Acceptance Criteria
SWEHBVD:SWE-034 - Acceptance Criteria
nopaneltrue

Include Page
SWE-034 - SA Task1
SWE-034 - SA Task1

Div
idtabs-5

5. Training

3.4 Software Training

SWE-017 - Project and Software Training

Div
idtabs-6

6. Classification

3.5 Software Classification Assessments

SWE-020 - Software Classification 
SWE-176 - Software Records 

3.9 Software Development Processes and Practices

SWE-032 - CMMI Levels for
                   Class A and B Software

Div
idtabs-7

7. Assurance and Safety 

3.6 Software Assurance and Software
Independent Verification & Validation

SWE-022 - Software Assurance
SWE-141 - Software Independent Verification
                   and Validation
SWE-131 - Independent Verification and
                   Validation Project Execution Plan
SWE-178 - IV&V Artifacts
SWE-179 - IV&V Submitted Issues and Risks

3.7 Safety-Critical Software

SWE-205 - Determination of Safety-
                  Critical Software 
SWE-023 - Software Safety-Critical
                   Requirements 
SWE-134 - Safety Critical Software
                   Design Requirements
SWE-219 - Test Coverage for Safety
                   Critical Software Components

SWE-220 - Cyclomatic Complexity Values
                   for Safety Critical Software

Div
idtabs-8

8. Coding Techniques

3.8 Automatic Generation of Software Source Code

SWE-146 - Auto-generated Source Code 
SWE-206 - Auto-Generation Software Inputs

3.10 Software Reuse

SWE-147 - Specify Reusability Requirements
SWE-148 - Contribute to Agency
                   Software Catalog

Div
idtabs-9

9. Cybersecurity

3.11 Software Cybersecurity

SWE-156 - Evaluate Systems for
                   Security Risks
SWE-154 - Identify Security Risks
SWE-157 - Protect Against
                   Unauthorized Access
SWE-159 - Verify and Validate Risk
                   Mitigations 
SWE-207 - Secure Coding Standard
SWE-185 - Verification of Software Code
                   to Coding Standards
SWE-210 - Detection of Adversarial Actions

Div
idtabs-10

10. Scope Management

3.12 Software Bi-Directional Traceability

SWE-052 - Bidirectional Traceability