01. Introduction
12. Software Development Activity
23. Software Assurance Activity
Div
idtabs-1

1. Introduction

Note

Typically starts with a quote from the NPR that helps define the activity. Additional descriptive material is meant to help define the activity but not be so detailed that it pulls in all of the guidance from the SWEs in the activity. 

Panel
borderColorblue
titleNPR 7150.2B para 4.3.1

Include Page
2D-Para 4.3.1
2D-Para 4.3.1
Software peer reviews and inspections are the in-process technical examination of work products by peers to find and eliminate defects early in the life cycle. Software peer reviews and inspections are performed following defined procedures covering the preparation for the review, the review itself is conducted, results are recorded, results are reported, and completion criteria is certified. When planning the composition of a software peer review or inspection team, consider including software testing, system testing, software assurance, software safety, software cybersecurity, and software IV&V personnel.

Panel
borderColorblack
borderWidth2
titleInputs, Outputs, and Predecessor Activities

Activity graphical representation of Inputs, Outputs, Predecessor and Successor Activities as appropriate. Not meant to be exhaustive, but representative of a typical project. 


1.1 Inputs

Note

List of some of the inputs from other activities that are necessary for the activity to begin. 

Examples: 

1.2 Predecessor Activities

Note

List of some of the other activities that must be started (not necessarily completed) so that this activity may begin. 

Examples: 

1.3 Outputs

Note

List of some of the outputs or work products of the activity. These are typically used as inputs by the downstream activity. In some cases there is a supporting SWE associated with the work product. 

Output Work ProductUsed by Downstream Activity


1.4 Successor Activities

Note

Links to Activities which might be started or supported by this activity. 

1.5 Activity Repetition

Note

Describe what conditions determine if the activity needs to be repeated, such as re-planning after a change in requirements or schedule constraints. 

  • How much of the activity needs to be repeated
  • Frequency of repetition
  • ACTIVITY is always done once. Ideally it will be peer reviewed and analyzed by Software Assurance. 
  • ACTIVITY may be reviewed and re-analyzed as often as there are significant changes in architecture or requirements. For example,  
    • Technology changes to the architecture requires changes to the ACTIVITY
    • Customer changes to requirements require changes to the ACTIVITY

1.6 Center Resources From SPAN

Note

Add links to SPAN activity pages that are appropriate for this activity. Use links from the Activity section of the front page. SPAN

Several Centers Process Asset Libraries have materials related to this activity. Related Processes, templates, and other resources may be found in the following Activities in SPAN (available to NASA only). 


IDD - Interface Design DescriptionSUM - Software User ManualSoftware Design Principles6.3 - Checklist for Choosing a Real Time Operating System (RTOS)6.4 - Checklist for Choosing Off-The Shelf Software (OTS)
  • TITLE/LINK

    • EXCERPT

2.3 Other Associated SWEs, Topics, etc.

Div
idtabs-2

2. Software Development Activity

Note

This tab contains the links to pages in the SWEHB that are at the heart of the activity. 

2.1 SWEs

Note

This section contains the links to SWE pages that form the heart of the activity.  For each SWE, the related tasks from tab 4 are listed. 

aafds
    • Excerpt
    • Tasks


2.2 Topics and other Supporting Materials

Note

This section is for SWEHB pages, other than SWEs, that directly support the activity. This section contains Topics, document content pages, PATs, and other pages. 

SwDD - Software Design Description 
Excerpt Include
SWEHBVD:SwDD - Software Design DescriptionSWEHBVD:SwDD - Software Design Description
nopaneltrue
Excerpt Include
SWEHBVD:IDD - Interface Design DescriptionSWEHBVD:IDD - Interface Design Description
nopaneltrue
Excerpt Include
SWEHBVD:SUM - Software User ManualSWEHBVD:SUM - Software User Manual
nopaneltrue
Excerpt Include
SWEHBVD:Software Design PrinciplesSWEHBVD:Software Design Principles
nopaneltrue
Include Page
SWEHBVD:Principles TableSWEHBVD:Principles Table
Excerpt Include
SWEHBVD:6.3 - Checklist for Choosing a Real Time Operating System (RTOS)SWEHBVD:6.3 - Checklist for Choosing a Real Time Operating System (RTOS)
nopaneltrue
Excerpt Include
SWEHBVD:6.4 - Checklist for Choosing Off-The Shelf Software (OTS)SWEHBVD:6.4 - Checklist for Choosing Off-The Shelf Software (OTS)
nopaneltrue
Note

Includes other SWEHB pages that are indirectly associated with the activity. May include SWEs, Topics, document definition pages, PATs, etc. They may have been mentioned in the guidance of another page. this section may be removed if there is no content for it. 

SWE-058 - SA Task5

    • Software Assurance Products
    • Software Design Analysis
    • Results of software assurance design analysis, including assessments in Tasks 1, 2, and 3. 
    • List of any identified design risks and issues.
    • Metrics
    • # of architectural issues identified vs. number closed.
    • # of design issues found versus the number of design issues resolved.
    • # of safety-related requirement issues (Open, Closed) over time.
    • # of safety-related non-conformances identified by life cycle phase over time.
    • # of software work product Non-Conformances identified by life cycle phase over time

3.2 Topics and Other Supporting Materials

SA Tasks for SWEsSWE-034 - Acceptance CriteriaSWE-134 - Safety-Critical Software Design RequirementsSWE-057 - Software ArchitectureSWE-143 - Software Architecture ReviewSWE-080 - Track and Evaluate ChangesSWE-081 - Identify Software CM ItemsSWE-203 - Mandatory Assessments for Non-ConformancesPAT-021 - SADESIGN ChecklistPAT-023 - Preparing for a SARB ChecklistPAT-031 - Critical Design Analysis ChecklistPAT-008 - Safety Considerations for Design Peer Reviews ChecklistPAT-020 - Examples of Interface Problems
true

3.3 Other Associated SWEs, Topics, etc.

Div
idtabs-3

3. Software Assurance Activity

Software Assurance is integral to the performance of all Software Development activities. It includes Process Monitoring as well as Process Analysis. 

  • Process Monitoring - addresses the question, "Is the development team following their processes and producing the expected work products?"
  • Process Analysis - addresses the question, "Are there better ways of performing the processes that would result in the early discovery of defects?"

3.1 Software Assurance Tasks from SWEs

Software Assurance Tasks are included in tab 7 of the SWEs in this activity. 

 Copy of SWE-058 - Detailed Design with new tab 4
    • Tasking From NASA-STD-8739.8B

Include Page
SWE-058 - SA Task1SWE-058 - SA Task1
Include Page
SWE-058 - SA Task2SWE-058 - SA Task2
Include Page
SWE-058 - SA Task3SWE-058 - SA Task3
Include Page
SWE-058 - SA Task4SWE-058 - SA Task4
Include Page
SWE-058 - SA Task5
Excerpt Include
SWEHBVD:Software Design AnalysisSWEHBVD:Software Design Analysis
nopaneltrue
Include Page
SWE-034 - SA Task1SWE-034 - SA Task1
Include Page
SWE-134 - SA Task1SWE-134 - SA Task1
Include Page
SWE-134 - SA Task4SWE-134 - SA Task4
Include Page
SWE-134 - SA Task5SWE-134 - SA Task5
Include Page
SWE-134 - SA Task6SWE-134 - SA Task6
Include Page
SWE-057 - SA Task1SWE-057 - SA Task1
Include Page
SWE-057 - SA Task2SWE-057 - SA Task2
Include Page
SWE-143 - SA Task1SWE-143 - SA Task1
Include Page
SWE-080 - SA Task1SWE-080 - SA Task1
Include Page
SWE-081 - SA Task2SWE-081 - SA Task2
Include Page
SWE-203 - SA Task2SWE-203 - SA Task2
Excerpt Include
PAT-021 - SADESIGN ChecklistPAT-021 - SADESIGN Checklist
nopaneltrue
Excerpt Include
PAT-023 - Preparing for a SARB ChecklistPAT-023 - Preparing for a SARB Checklist
nopaneltrue
Excerpt Include
PAT-031 - Critical Design Analysis ChecklistPAT-031 - Critical Design Analysis Checklist
nopaneltrue
Excerpt Include
PAT-008 - Safety Considerations for Design Peer Reviews ChecklistPAT-008 - Safety Considerations for Design Peer Reviews Checklist
nopaneltrue
Excerpt Include
PAT-020 - Examples of Interface ProblemsPAT-020 - Examples of Interface Problemsnopanel
Note

Includes other SWEHB pages that are indirectly associated with the activity. May include SWEs, Topics, document definition pages, PATs, etc. They may have been mentioned in the guidance of another page. this section may be removed if there is no content for it.