bannerd

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

UNDER CONSTRUCTION

...

01. Introduction
12. Initiation and Planning
23. Estination
34. Schedules
45. Training
56. Classification
6Assurance and Safety
7Coding
89. Cybersecurity
910. Scope

...

idtabs-1

1. Introduction

Initiation and Planning activities occur at the beginning of a project.

A project may be for the creation of a new product, or the enhancement of an existing product. It may even involve the merging of capabilities from multiple products into a new, more capable product. It is always necessary to have an understanding of what the outcome of the project is. This is often called the High Level Requirements. These requirements set direction for the project.  Once the direction is set, an early activity is the Make, Buy or Reuse decision. 

1.1 Related Activities

...

idtabs-2

2. Safety

2.1 Related NPR 7150.2 SWEs

3.7 Safety-Critical Software

SWE-205 - Determination of Safety-
                  Critical Software 
SWE-023 - Software Safety-Critical
                   Requirements 
SWE-134 - Safety Critical Software
                   Design Requirements
SWE-219 - Test Coverage for Safety
                   Critical Software Components

SWE-220 - Cyclomatic Complexity Values
                   for Safety Critical Software

2.2 Related Topics and Process Assets

Div
idtabs-3

3. 

Div
idtabs-4

4.

Div
idtabs-5

5.

Div
idtabs-6

6.

Div
idtabs-7

7.

Div
idtabs-8

8.

Div
idtabs-9

9.

Div
idtabs-10

10.