Invalid license: Your evaluation license of Refined expired.
bannerd

Search

Search

Help

Page 1 of 8. Showing 71 results (0.018 seconds)

  1. 7.04 - Flowdown of NPR Requirements on Contracts and to Other Centers in Multi-Center Projects

    sam cd sa acq_plan pf pp plan pm pm-c Migration of unmigrated content due to installation of a new plugin
  2. 7.06 - Software Test Estimation and Testing Levels

    information on test planning can be found in SWE-104. Software Assurance (SA) is typically present at the Flight Software (FSW) Acceptance Review. Presentation1.jpg … SWE-114 Software Test Procedures SWE-118 Software Test Report 6. References 6.1 Tools sa acq_plan cdr in/over pf pdr pp pm v-v
  3. SWE-055 - Requirements Validation

    . cd smproj reports sa sre tool ansc asc bsc bnsc csc cnsc dsc g f esc ll pi pm sar Migration of unmigrated content due to installation of a new plugin
  4. SWE-118 - Software Test Report

    There are currently no Lessons Learned identified for this requirement. cd smproj reports sa ansc asc bsc bnsc csc cnsc dsc g f esc pi pm v-v sar Migration
  5. 7.12 - Qualification of Flight Software

    . Resources 5.1 Tools sra records sa sre sm cm design frr orr pi pm c-i v-v prod_desc sar Migration of unmigrated content due to installation of a new
  6. SWE-131 - Independent Verification and Validation Project Execution Plan

    csma smproj sa ansc asc bsc bnsc csc cnsc dsc esc ll pp plan pm v-v favourite Migration of unmigrated content due to installation of a new plugin
  7. SWE-054 - Corrective Action for Inconsistencies

    of acceptance test results), train personnel in software walk throughs, and verify consistent engineering units on all parameters. cd reports sa sre
  8. SWE-134 - Safety Critical Software Requirements

    ." sam csma cd sdr sa process sre srr swrr analysis ansc asc bsc bnsc cm cdr design ll pdr pe pm sar Migration of unmigrated content due to installation of a new
  9. SWE-053 - Manage Requirements Changes

    in the Faster, Better, Cheaper mode: Requirement changes without adequate resource adjustment." cd smproj reports sa sre tool analysis ansc asc bsc bnsc csc
  10. SWE-104 - Software Test Plan

    , the consequences should be considered of their being issued during the system test or the pre-launch phases." cd smproj sa ansc asc bsc bnsc csc