Invalid license: Your evaluation license of Refined expired.
bannerd

Search

Search

Help

Page 1 of 2. Showing 13 results (0.008 seconds)

  1. SWE-115 - Software User Manual

    . 5. Resources 6. Lessons Learned No Lessons Learned have currently been identified for this requirement. cd pr train ansc asc bsc bnsc csc
  2. SWE-078 - As-built Documentation

    been identified for this requirement. sam cd pr acq_plan ansc asc bsc bnsc csc cnsc cm dsc g f esc pc pm prod_desc sar Migration of unmigrated
  3. SWE-084 - Configuration Audits

    and [contractor]." cd smproj records pr sre ansc asc bsc bnsc csc cm dsc design g f esc ll pm c-i v-v pm-c Migration of unmigrated content due
  4. SWE-077 - Deliver Software Products

    controller software prepared as part of their software development process is being given to each vendor." sam cd reports records pr acq_plan ansc asc bsc
  5. SWE-063 - Release Version Description

    Review Board issued a set of recommendations that may help to avoid future over-test incidents." sam sra cd records sa pr tool ansc asc bsc bnsc csc
  6. SWE-082 - Authorizing Changes

    ), change request (CR), problem report (PR), etc. as appropriate and applicable for the project). Include instructions for properly completing the change request … ." cd smproj procedure pr sre ansc asc bsc bnsc csc cm dsc design g f esc ll h pi pm c-i v-v Migration of unmigrated content due to installation
  7. SWE-083 - Status Accounting

    . 5. Resources 6. Lessons Learned There are currently no Lessons Learned identified for this requirement. cd smproj records pr sre
  8. SWE-085 - Release Management

    There are currently no Lessons Learned identified for this requirement. cd smproj sdr procedure pr srr swrr ansc asc bsc bnsc csc cnsc cm cdr ensc dsc dnsc g
  9. 7.14 - Implementing Measurement Requirements and Analysis for Projects

    . Resources 5.1 Tools reports records sdr pr sre srr tool swrr acq_plan analysis cdr design mcr mdr pdr pp plan pm c-i v-v m-a sar prr sir trr pm-c
  10. 7.09 - Entrance and Exit Criteria

    1 1 Entrance and Exit Criteria Background This guidance provides the maximum set of life cycle review entrance and exit criteria for software projects and should be tailored for the project class. This guidance is a summarized collection of material from the following core documents: NPR 7123.1, App