Page 3 of 56. Showing 559 results (0.019 seconds)
SWE-212 - NASA-STD-8739 Mapping Matrices
2D-SWE Page Message Content updates needed on this page: Update tabs as necessary 1. Requirements 2.1.2.4 The NASA Chief, SMA shall periodically review the project’s requirements mapping matrices. 1.1 Notes NPR 7150.2, NASA Software Engineering Requirements, does not include any notes for this requirement. 1.SWE-152 - Review Requirements Mapping Matrices
5.j.8 - "Support and provide information for assessments of Centers' and contractors' capabilities and compliance with engineering and program/project management requirements and standards.” 2D-SWE Page Message 1. Requirements 2.1.1.3 The NASA OCE shall periodically review the project requiremeSWE-208 - Advancing Software Assurance and Software Safety Practices
2D-SWE Page Message 1. Requirements 2.1.2.2 The NASA Chief, SMA shall lead and maintain a NASA Software Assurance and Software Safety Initiative to advance software assurance and software safety practices. 1.1 Notes NPR 7150.2, NASA Software Engineering Requirements, does not include any notes for this requiremeSWE-209 - Benchmarking Software Assurance and Software Safety Capabilities
2D-SWE Page Message Content updates needed on this page: Update tabs as necessary 1. Requirements 2.1.2.3 The NASA Chief, SMA shall periodically benchmark each Center’s software assurance and software safety capabilities against the NASA-STD-8739.8, NASA Software Assurance and Software Safety Standard. 1.1 NoteSWE-098 - Agency Process Asset Library
2D-SWE Page Message 1. Requirements 2.1.1.6 The NASA OCE shall maintain an Agency-wide process asset library of applicable best practices and process templates for all size projects. 1.1 Notes NPR 7150.2, NASA Software Engineering Requirements, does not include any notes for this requirement. 1.2 History SWESWE-100 - Software Training Funding
2D-SWE Page Message Content updates needed on this page: Update tabs as necessary 1. Requirements 2.1.1.5 The NASA OCE and Center training organizations shall provide training to advance software engineering practices. 1.1 Notes NPR 7150.2, NASA Software Engineering Requirements, does not include any notes fSWE-129 - OCE NPR Appraisals
“The baseline set of questions are reviewed and may be revised as needed to support the survey at each specific organization. Input for updates to the questions is obtained from survey team members including the software engineering sub-team lead, the systems engineering sub-team lead, and the Office of the Chief InfoSWE-002 - Software Engineering Initiative
"defines a NASA-wide comprehensive approach for improving software engineering to a quantifiable maturity level commensurate with mission criticality in order to meet the software challenges of NASA." 2D-SWE Page Message Content updates needed on this page: Added crosslinks to related pages.SWE-050 - Software Requirements
2D-SWE Page Message Content updates needed on this page: Guidance Rebuild flow diagram to remove SWE-028 which was removed after version B. 1. Requirements 4.1.2 The project manager shall establish, capture, record, approve, and maintain software requirements, including requirements for COTS, GOTS, MOTS, OSS5.09 - SRS - Software Requirements Specification
2D-Topic Page Message Content updates needed on this page: To be renamed to "5.09 - SRS - Software Requirements Specification" Fix References report Return to 7.18 - Documentation Guidance 1. Minimum Recommended Content Minimum recommended content for the Software Requirements Specification. The following se


