SWE-192 - Last used in rev NPR 7150.2D

RevSWE Statement
A


Difference between A and B

N/A

B


Difference between B and C

NEW

C

4.5.12 The project manager shall verify through test the software requirements that trace to a hazardous event, cause, or mitigation technique.

Difference between C and DNo change
D

4.5.12 The project manager shall verify through test the software requirements that trace to a hazardous event, cause, or mitigation technique.