SWE-151 - Last used in rev NPR 7150.2D
Rev | SWE Statement |
---|---|
A | |
Difference between A and B | NEW - Split from Rev A SWE-015 and added items d-f. |
B | 3.2.2 The project manager‘s software cost estimate(s) shall satisfy the following conditions:
|
Difference between B and C | To item d., added cybersecurity; To item e., made SA support required by adding "of the required". |
C | 3..2.2 The project manager’s software cost estimate(s) shall satisfy the following conditions:
|
Difference between C and D | Updated item b. to include programmatic assumptions/constraints and clarified item d. |
D | 3.2.2 The project manager’s software cost estimate(s) shall satisfy the following conditions: a. Covers the entire software life cycle. |