SWE-142 - Last used in rev NPR 7150.2D
Rev | SWE Statement |
---|---|
A | |
Difference between A and B | NEW |
B | 2.1.3.12 For Class A, B, and C software projects, each Center Director shall establish and maintain a software cost repository(ies) that contains at least the following measures: a. Planned and actual effort and cost. |
Difference between B and C | Added "or designee" |
C | 2.1.5.12 For Class A, B, and C software projects, each Center Director, or designee, shall establish and maintain software cost repository(ies) that contains at least the following measures:
|
Difference between C and D | No Change |
D | 2.1.5.10 For Class A, B, and C software projects, each Center Director, or designee, shall establish and maintain software cost repository(ies) that contains at least the following measures: a. Planned and actual effort and cost. |