SWE-089 - Last used in rev NPR 7150.2D
Rev | SWE Statement |
---|---|
A | 4.3.4 The project shall, for each planned software peer review/inspection, record basic measurements. |
Difference between A and B | No change |
B | 5.3.4 The project manager shall, for each planned software peer review or software inspection, record basic measurements. |
Difference between B and C | Changed "basic" to "necessary" measurements |
C | 5.3.4 The project manager shall, for each planned software peer review or software inspection, record necessary measurements. |
Difference between C and D | No change |
D | 5.3.4 The project manager shall, for each planned software peer review or software inspection, record necessary measurements. |