SWE-003 - Last used in rev NPR 7150.2D
Rev | SWE Statement |
---|---|
A | 1.2.2 Each Center shall maintain, staff, and implement a plan to continually advance its in-house software engineering capability and monitor the software engineering capability of NASA's contractors, as per NASA's Software Engineering Initiative Improvement Plan. |
Difference between A and B | Reworded and removed reference to NASA SEIIP. |
B | 2.1.3.2 Center Directors, or designees, shall maintain, staff, and implement a plan to continually advance the Center’s in-house software engineering capability and monitor the software engineering capability of NASA's contractors. |
Difference between B and C | No change |
C | 2.1.5.2 Center Director, or designee, shall maintain, staff, and implement a plan to continually advance the Center’s in-house software engineering capability and monitor the software engineering capability of NASA's contractors. |
Difference between C and D | No change |
D | 2.1.5.2 Center Director, or designee, shall maintain, staff, and implement a plan to continually advance the Center’s in-house software engineering capability and monitor the software engineering capability of NASA's contractors. |