Activities and Composition

1. Activities and Their SWEHB Components

This is a working page to build the list of activities and the SWEs and topics that define them. 

The table below was built from the activity descriptions in NPR 7150.2D chapters 3 thru 5. These are highlighted in yellow. The activity name includes the numbering that came from the NPR. Once we are sure that we know what activities we want to use, we should renumber the activities in a way that seems appropriate. 

Additional activities were derived from chapter 2. These chapter 2 activities were then copied into the activities highlighted in yellow where they seemed most likely to belong. See the subheading "SWEs from Ch 2 - Institutional Requirements". 

At this point, all SWEs and Topics are represented "somewhere" in this scheme. It does not mean that they are in all of the appropriate places. Once we decide that the activity names should be, adding and deleting as appropriate, we will need to make sure that all of the SWEs, Topics and other pages are represented in the appropriate Activities. 

Distribution Of SWEs Into Activities

  • All SWEs in NPR 7150.2D are represented in an activity in the yellow group. SWEs that come from chapter 2 represent things that are done at the Institutional level to enable projects to perform a SWE at the project level. In a sense, they are enabling SWEs.

Distribution Of Topics And PATs Into Activities

  • All topics are represented in at least one activity.
  • Some topics are associated with multiple SWEs and may appear in more than one activity. For example, topic 8.5 - SW Failure Modes and Effects Analysis deals with design as well as has safety related considerations as well. It appears in both the 3.7 Safety-Critical Software and 4.3 Software Design activities. 
  • All PATs are represented in at least one activity. Some PATs may appear in multiple activities depending on the same criteria as topics.

Topics That Don't Fit Into Activities

  • There are a few topics that don't fit into the activity scheme. They are listed in the next to last row in the red highlight. 

Activities That Are Not Represented In This Model

  • There are a few topics that are not represented in this activity model. They are listed in the last row in the green highlight. If we want this activity model to match more closely with the way projects do their work, it may be necessary to add these activities into the model and move the appropriate SWEs, Topics, PATs, etc. into them. 

Additional Considerations Moving Forward

  • 3.8 Automatic Generation of Software Source Code content might be better to put into the activity 4.3 Software Design or 4.4 Software Implementation
  • 3.12 Software Bi-Directional Traceability has only one SWE and no other topics or other materials associated with it. It may be more appropriate to put this SWE under 4.1 Software Requirements
  • 4.2 Software Architecture and 4.3 Software Design might be better to consider as a single activity. 


Activity NameSWEs SWEHB Components: Related Topics, Document Structures, Principles, Checklists, and PATs
3.1 Software Life Cycle Planning

3.2 Software Cost Estimation

3.3 Software Schedules

3.4 Software Training

SWEs from Ch 2 - Institutional Requirements

3.5 Software Classification
Assessments


SWEs from Ch 2 - Institutional Requirements
3.6 Software Assurance
and Software Independent
Verification & Validation


3.7 Safety-Critical Software
3.8 Automatic Generation of
Software Source Code
3.9 Software Development
Processes and Practices
3.10 Software Reuse

SWEs from Ch 2 - Institutional Requirements

3.11 Software Cybersecurity
3.12 Software Bi-Directional Traceability
4.1 Software Requirements
4.2 Software Architecture
4.3 Software Design
4.4 Software Implementation
4.5 Software Testing
4.6 Software Operations,
Maintenance, and Retirement
5.1 Software Configuration
Management (SCM)
5.2 Software Risk Management 
5.3 Software Peer Reviews
and Inspections
5.4 Software Measurements

SWEs from Ch 2 - Institutional Requirements

5.5 Software Non-conformance
or Defect Management


  • 7.18 - 
CR-PR - Software Change Request - Problem Report
Other SWEHB pages that don't fit into the "activity" model

Other Activities for consideration: 

  • Acquisition - found in existing activities such as Planning and Architecture
  • Monitor and Control - found in Planning and 5.5 Software Non-conformance or Defect Management


2. Definitions

In the context of this view of the SWEHB, some definitions are in order. These are ideas for helping partition the information so it can be organized in a way to make finding things easier. 

2.1 Activity

General name for a set of processes, performed by one or more groups of stakeholders in the lifecycle of the development of a software product. Activity names may align with project phases in some cases depending on the development process or life cycle chosen for the project. Some activities are performed in a sequence. Others may be started and continue while others start up later and run in parallel with other activities. An example of this is coding and testing. These activities may appear to run together while different portions or releases of the code are being developed. 

An activity is composed of

  • SWE requirements that are satisfied during the conducting of the activity, and
  • Other work described in the other SWEHB components. 

2.2 SWE Components

Each SWE requirement is composed of one or more objectives that represent an industry best practice that OCE expects projects (on the agency in the case of Institutional Requirements) to perform. How these objectives are achieved is at the discretion of the group satisfying the requirement. Each SWE page lists some tasks that would accomplish the requirement, and guidance on how they might be completed. 

Tasks for the Software Engineering (tab ?) as well as Software Assurance (tab 7) are listed. In cases where additional support or more in depth guidance is available, the reader is referred to a Topic. 

2.3 Other SWEHB Components

Any page in the SWEHB that contains guidance on performing a process, creating a document, implementing a development tool, preparing for or conducting a review, or other related topic supporting the work of an activity. 

The Topics page could be expanded to organize and present more groupings of topics. Numbering of topics allows existing reference macros to be used in the Resources tab of the topic. 

Components include: 

Component TypeTopic SeriesComponent Description
Document Content5.xxDescribes the minimum content expected in a particular document
Checklist6.xxList of things to consider when performing some development or assurance task in a project. Checklists are frequently designed as a Process Asset Template (PAT).
PAT (Process Asset Template)PAT-xxxList of things to do or consider when performing a development or assurance task in a project. These may be used in any of the other Topic series
Review4.xx

List of things to do or consider when performing a development or assurance task in a project. Usually includes Items for:

  • Preparing for the review
  • Actions taken during the review
  • Actions taken after the review
Process1.xx

Regularly performed set of actions with an expected set of outcomes. An example might be a generic Peer Review Process. A process usually contains: 

  1. Triggers that cause the process to be initiated
  2. Inputs
  3. Process Steps which may be performed in a sequence or simultaneously
  4. Outputs
  5. Follow up actions, e.g. defects that need to be fixed
Software Engineering Topics7.xxIn depth guidance on Software Engineering topics. 
Software Assurance Topics8.xxIn depth guidance on Software Assurance topics.
Software Safety Topics3.xxIn depth guidance on Software Safety topics.
Software Design Principles9.xxSoftware Design Principles. 
Cybersecurity Topics2.xxIn depth guidance on Software Cybersecurity topics.

3. Distribution of Chapter 2 SWEs

The SWEs from NPR 7150.2D chapter 2 are the Institutional Requirements. Initially, I grouped them into 7 "activities" to make sure that they didn't fall out of the overall activity scheme. The table below is the result of that work. 

SWEs that come from chapter 2 represent things that are done at the Institutional level to enable projects to perform a SWE at the project level. In a sense, they are enabling SWEs.

Additional activities were derived from chapter 2 and are highlighted blue below as the first 7 activities. These chapter 2 activities were then copied into the activities in tab 1, highlighted in yellow, where they seemed most likely to belong. 

Activity NameSWEs SWEHB Components: Related Topics, Document Structures, Principles, Checklists, and PATs

"Benchmarking and Appraisals"

Moved to 3.9 Software Development
Processes and Practices

"Licensing, Sharing and Reuse"

Moved to 3.10 Software Reuse

"Measurements and Metrics"

Moved to 5.4 Software Measurements

"Process Definition"

Moved to 3.9 Software Development
Processes and Practices

"Process Library"

Moved to 3.9 Software Development
Processes and Practices


"Requirement Mapping, Tailoring,
and Classification"

Moved to 3.5 Software Classification
Assessments
 

"Training"

Moved to 3.4 Software Training

4. Activity Groupings

In this tab I will construct the new table of Activities based on the input from all of you. The

  • SWEHB Activity will be the name of the activity we use going forward.  
  • NPR Activity Groupings reflects the names of the groups of SWEs found in the NPR. They have the chapter and location number so we wont get confused. 



SWEHB ActivityNPR Activity Groupings 
1Planning

3.1 Software Life Cycle Planning

3.2 Software Cost Estimation

3.3 Software Schedules

3.4 Software Training

3.5 Software Classification
Assessments


2Monitor and Control

5.5 Software Non-conformance
or Defect Management


3Requirements Management

4.1 Software Requirements

3.12 Software Bi-Directional Traceability


4Architecture and Design

4.2 Software Architecture

4.3 Software Design

3.10 Software Reuse


5Implementation and Coding

4.4 Software Implementation

3.8 Automatic Generation of
Software Source Code


6Testing4.5 Software Testing
7IV&V3.6 Software Assurance
and Software Independent
Verification & Validation

8Release, Operations,
Maintenance, and Retirement
4.6 Software Operations,
Maintenance, and Retirement

9Software Assurance3.6 Software Assurance
and Software Independent
Verification & Validation

10Software Development
Processes and Practices
3.9 Software Development
Processes and Practices

11Safety-Critical Software3.7 Safety-Critical Software
12Cybersecurity3.11 Software Cybersecurity
13Configuration Management5.1 Software Configuration
Management (SCM)

14Risk Management5.2 Software Risk Management
15Peer Reviews and Inspections5.3 Software Peer Reviews
and Inspections

16Measurements and Metrics5.4 Software Measurements

5. Activity Diagram

This activity Diagram represents the SWEHB Activities and their layout on a timeline. The timeline is notional and only represents the predecessors and successors and not any iterations that might be necessary in the real world. 