bannerd

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 13 Next »

UNDER CONSTRUCTION

Peer Review Activity

1. Introduction


NPR 7150.2B para 5.3.1

Software peer reviews and inspections are the in-process technical examination of work products by peers to find and eliminate defects early in the life cycle. Software peer reviews and inspections are performed following defined procedures covering the preparation for the review, the review itself is conducted, results are recorded, results are reported, and completion criteria is certified. When planning the composition of a software peer review or inspection team, consider including software testing, system testing, software assurance, software safety, software cybersecurity, and software IV&V personnel.

1.1 Inputs

  • Planning - Peer Reviews are planned activities. They appear in the plans and schedules for the project
  • Requirements - These are the things that are Peer Reviewed
  • Architecture Items - These are the things that are Peer Reviewed
  • Design items - These are the things that are Peer Reviewed
  • Test Plans and Procedures - These are the things that are Peer Reviewed

1.2 Predecessor Activities

Predecessor Activities are performed before Peer Reviews. These activities produce the work products that will be reviewed. 

  • Life Cycle Planning - plans, schedules, estimates, etc.
  • Software Architecture 
  • Software Design
  • Software Testing - plans and procedures

1.3 Outputs

The activities that initiated the Peer Review, receive the findings from Peer Reviews, Those activities then use those findings to to fix defects and implement improvements uncovered in the reviews. 

Output Work ProductUsed by Downstream ActivitySupporting SWE or Topic
Peer Review Findings
  • Life Cycle Planning
  • Software Architecture 
  • Software Design
  • Software Testing
  • Configuration Management
  • Coding



2. Defining the Activity

2.1 SWEs

2.2 Topics and other Supporting Materials

This section is for SWEHB pages, other than SWEs, that directly support the activity. This section contains Topics, document content pages, PATs, and other pages. 


2.3 Other Associated SWEs, Topics, etc.

Includes other SWEHB pages that are indirectly associated with the activity. May include SWEs, Topics, document definition pages, PATs, etc. They may have been mentioned in the guidance of another page. 

Click on a link to download a usable copy of the template. 



3.


4.


5.


  • No labels

0 Comments